24.08.2015 Views

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4 Ground Rules & AssumptionsThis section defines ground rules and assumptions to be used in concept definition and assessment. It alsoprovides guidance for element-level requirements.4.1 Safety FactorThe structural safety factor shall be two times the highest expected stress.Where the maximum stress is not known, the structure shall be designed for three times the nominal steadystatestress.4.2 Economic Analysis WindowThe economic analysis window shall be 10 years from the 1 st launch after full-up system authority toproceed.4.3 Power SourceThe primary power source for long-term orbiting elements shall be solar. On-board energy storage ispermitted.4.4 Primary PropulsionElectrodynamic propulsion shall be the primary mode of propulsion for the LEO <strong>Tether</strong> Facility.4.5 PAA Role in Rendezvous & GrappleThe PAA shall cooperate in meeting the grapple.This could include position and speed control, or just attitude control, or just transmission of navigationdata, or (conceivably) no action.4.6 <strong>Tether</strong> Control Station Reeling RateIf the <strong>Tether</strong> Control Station reels in the tether, the reeling rate shall not be required to exceed 2 m/s.4.7 <strong>Tether</strong> Control Station Thermal ControlThe <strong>Tether</strong> Control Station shall use passive thermal control.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!