24.08.2015 Views

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LEOGTO <strong>Tether</strong> Boost Facility• Designed to Boost 2,500 kg payloads from LEO to GTO - Total ∆V = 2.4 km/s• Operational Capability Can be Placed in LEO with One Delta-IV-H Launch<strong>Tether</strong> Mass: 8,275 kgGrapple Assembly: 650 kgControl Station Mass:11,500 kgTotal Launch Mass:20,500 kg+ Delta-IV Upper Stage for Ballast: 3,490 kg• Facility Can also Toss 500 kg payloads to Lunar Transfer Orbit• Uses Electrodynamic Reboost to Enable Facility to Boost 1 Payload Per MonthTUI/MMOSTT 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!