24.08.2015 Views

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

Moon & Mars Orbiting Spinning Tether Transport - Tethers Unlimited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Tether</strong>s <strong>Unlimited</strong>, Inc.<strong>Tether</strong> Rendezvous10.8TipMiddleFacilityLoad Level0.60.40.202000 2200 24002600 2800 3000Time (s)Figure 17. <strong>Tether</strong> loading at tip, middle, and facility after the payload is released at T=2075.i . Hoyt, R.P., ÒCislunar System Dynamics Verification Through SimulationÓ, Appendix C in Cislunar<strong>Tether</strong> <strong>Transport</strong> System, <strong>Tether</strong>s <strong>Unlimited</strong>, Inc. Final Report on NIAC Contract 07600-011.ii . Lorenzini, E.C., Mowery, D.K., Rupp, C.C., ÒSEDS-II Deployment Control Law and Mission DesignÓ,Proceedings of the Fourth International Conference on <strong>Tether</strong>s In Space, Vol II, p. 669.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!