TACTICAL REVITALIZATION PLAN FOR DOWNTOWN ALBANY NY
tactical revitalization plan for downtown albany, ny - Capitalize ...
tactical revitalization plan for downtown albany, ny - Capitalize ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Team Profile, Qualifications, and Experience<br />
Buro Happold<br />
Neil A. Porto PE<br />
Principal<br />
Role on Project: Project Director<br />
Mr. Porto has nearly 30 years of progressive experience<br />
in infrastructure project management, project planning,<br />
civil and structural engineering, quality assurance/<br />
quality control, and construction management. He<br />
has managed complex, high-profile projects and led<br />
the development of comprehensive master plans,<br />
transportation studies, environmental documentation,<br />
and phased rehabilitation programs. He has specialized in<br />
the evaluation and assessment of complex engineering<br />
projects and presented to clients and the public to aid in<br />
informed decision-making and phased implementation<br />
of infrastructure improvements.<br />
Key Project Information<br />
The High Line / New York, <strong>NY</strong><br />
St. Petersburg Pier / St. Petersburg, FL<br />
East River Park Waterfront Redevelopment * / New York, <strong>NY</strong><br />
Stuyvesant Cove Park* / New York, <strong>NY</strong><br />
North Shore Esplanade* / Staten Island, <strong>NY</strong><br />
Gateway Park & Atlantic Avenue Extension* / Queens, <strong>NY</strong><br />
Discipline<br />
Qualifications<br />
Registrations<br />
Firm<br />
Civil Engineering<br />
BCE, CornellUniversity; ISO 9001 Certified<br />
Quality Assurance Auditor<br />
Professional Engineer in <strong>NY</strong> and NJ<br />
2012 - Present<br />
Queens West Waterfront Park and Street and Infrastructure<br />
Improvements* / Queens, <strong>NY</strong><br />
Swindler Cove Park Pedestrian Bridges* / New York, <strong>NY</strong><br />
FDR Drive Rehabilitation, <strong>NY</strong>SDOT, East 54th Street to East<br />
53rd Street* / New York, <strong>NY</strong><br />
FDR Drive Rehabilitation, <strong>NY</strong>SDOT, East 34th Street<br />
Viaduct* / New York, <strong>NY</strong><br />
Route 9A Reconstruction, Segment 6* / New York, <strong>NY</strong><br />
Elevated Transit work for 10 Transit Stations for <strong>NY</strong>CT and<br />
LIRR* / New York, <strong>NY</strong><br />
Jamaica Station Plaza Intermodal Improvements* /<br />
Queens, <strong>NY</strong><br />
East River Park Redevelopment, New York, <strong>NY</strong>* Stuyvesant Cove Park, New York, <strong>NY</strong>* The High Line, New York, <strong>NY</strong><br />
* Denotes work done by Neil Porto prior to joining Buro Happold