6.2 Maintenance and Component Operation<br />

6.2.1 Electric Panel<br />

6.2.2 Filters<br />

51<br />

System Operation, Testing, and Maintenance<br />

The electric panel should be inspected on a semi-annual basis for any loose electrical connections.<br />

Filters are usually the most neglected item in an environmental control system. In order to maintain<br />

efficient operation, they should be checked monthly and changed as required. ALWAYS TURN<br />

POWER OFF BEFORE REPLACING FILTERS.<br />

Filters are replaced by opening the hinged door on the return air filter box.<br />

6.2.3 Blower System<br />

Monthly inspection of the blower package includes: motor mounts, belts, fan bearings, and impellers.<br />

Fan impellers should be thoroughly inspected and any debris removed. Check to see if they are tightly<br />

mounted on the fan shaft and do not rub against the fan housing during rotation. Motor and fan bearings<br />

are permanently sealed and self-lubricating and do NOT need lubricated.<br />

The drive belt should be checked monthly for signs of wear and proper tension. Pressing on belts midway<br />

between the sheave and pulley should produce from 1/2" to 1" (12 to 25 mm) of deflection. Belts<br />

that are too tight can cause excessive bearing wear.<br />

Belt tension can be adjusted by raising or lowering the fan motor base. Loosen nut above motor<br />

mounting plate to remove belt. Turn nut below motor mounting plate to adjust belt tension. If belt<br />

appears cracked or worn, it should be replaced with a matched belt (identically sized). With proper<br />

care, a belt should last several years.<br />

NOTE<br />

After adjusting or changing the belt, always be certain that motor base nuts are tightened. The<br />

bottom adjustment nut should be finger tight. The top locking nut should be tightened with a<br />

wrench.<br />

Air Distribution<br />

Since all unit models are designed for constant volume air delivery, any unusual restrictions within<br />

the air circuit must be avoided. High efficiency filters can reduce air performance and evaporator<br />

capacity.<br />

Blower Removal (Evaporator)<br />

If the blower or bearings must be removed or serviced, use the following procedure.<br />

1. Prepare the main center section of the three (3) piece electric panel by first marking and<br />

disconnecting all power and control wiring entering the panel.<br />

2. Remove the electric panel by removing screws from top and bottom sections<br />

3. Remove the bottom electric panel mounting flange from unit base.<br />

4. Remove the belt, motor, motor mounting plate, and tensioning bolt.<br />

5. Remove the four (4) screws holding the blower mounting rails to the sled.<br />

! CAUTION<br />

Protect refrigerant and water piping from damage.<br />

6. Remove the (4) screws holding the blower mounting rails to the sled.<br />

7. Slide the blower/rail assembly forward and rotate approximately 45 degrees and remove from<br />

unit.<br />

8. Replace failed parts.