RAPTA GUIDEL<strong>IN</strong>ES<br />

FOR PROJECT IDENTIFICATION AND<br />

DESIGN PHASES OF PROJECT CYCLE<br />

3<br />

This Chapter is addressed directly to project designers.<br />

We assume that you have read Chapter 2 which provides an<br />

overview of the RAPTA process.<br />

This chapter contains detailed guidelines for each component of<br />

RAPTA, listing some of the “whys” and “hows” of each, and<br />

provides examples mainly drawn from food security projects.<br />

However, this chapter may also be of use to those designing projects<br />

focused on other topics, including outside the GEF. Chapter<br />

4 provides an outline of how to use RAPTA to deliver the GEF<br />

requirements for project development and documentation.<br />

We know that it would be helpful to provide some worked<br />

examples that illustrate each element of the whole process for<br />

one example project, but as these guidelines have not yet been<br />

piloted, it is not possible to do so. Thus we have drawn, initially,<br />

on hypothetical examples.<br />

38 RAPTA guidelines for project design