DESIGNING PROJECTS IN A RAPIDLY CHANGING WORLD
srun3013fp1
srun3013fp1
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
RAPTA GUIDEL<strong>IN</strong>ES<br />
FOR PROJECT IDENTIFICATION AND<br />
DESIGN PHASES OF PROJECT CYCLE<br />
3<br />
This Chapter is addressed directly to project designers.<br />
We assume that you have read Chapter 2 which provides an<br />
overview of the RAPTA process.<br />
This chapter contains detailed guidelines for each component of<br />
RAPTA, listing some of the “whys” and “hows” of each, and<br />
provides examples mainly drawn from food security projects.<br />
However, this chapter may also be of use to those designing projects<br />
focused on other topics, including outside the GEF. Chapter<br />
4 provides an outline of how to use RAPTA to deliver the GEF<br />
requirements for project development and documentation.<br />
We know that it would be helpful to provide some worked<br />
examples that illustrate each element of the whole process for<br />
one example project, but as these guidelines have not yet been<br />
piloted, it is not possible to do so. Thus we have drawn, initially,<br />
on hypothetical examples.<br />
38 RAPTA guidelines for project design