14.12.2012 Views

Druck-Materie 20b.qxd - JUWEL - Forschungszentrum Jülich

Druck-Materie 20b.qxd - JUWEL - Forschungszentrum Jülich

Druck-Materie 20b.qxd - JUWEL - Forschungszentrum Jülich

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Main results:<br />

Radiation effects in methane hydrate are very similar to that of THF hydrate. Spontaneous<br />

burping was observed after 13 hours of irradiation at irradiation temperature 20 - 25 K. There<br />

were no spontaneous burps at T > 25 K. Recommended values of maximum allowable residence<br />

time of methane hydrate beads at 20 K are 1.5 hours.<br />

3. URAM-2 CRYOGENIC IRRADIATION FACILITY<br />

Brief description of the facility. The facility consists of four main parts (Fig. 1):<br />

charging device;<br />

irradiation rig head;<br />

liquid helium cooling system;<br />

measuring system.<br />

As is shown in the Fig. 1, the head part is connected to charging device by a transport tube,<br />

which allows to load or to unload samples. Through the helium pipeline, helium is delivered<br />

from liquid helium Dewar vessel to the sample situated inside irradiation rig head and then it<br />

is collected in a gas accumulated vessel. Electric placed communication lines and PC intend<br />

for collecting data during an experiment. The head part and terminal part of the helium pipelines<br />

are placed into an evacuated jacket with high vacuum. The keeping of high vacuum is<br />

utterly necessary to avoid wall heat load to the helium and to the samples. There is a<br />

beryllium reflector set behind the head part of the rig. It was done to increase fast neutron flux<br />

with better isotropy.<br />

Figure 1. General schematic view of irradiation facility “URAM-2”:<br />

(1) the IBR-2 reactor; (2) head part of the facility; (3) transport passage, helium pipelines and electric<br />

communications; (4) charging device; (5) shielding plug on rails; (6) liquid helium Dewar vessel; (7)<br />

gas containers; (8) PC with communications; (9) rails<br />

131

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!