26.01.2018 Views

2018 L&D Catalogue_Final_12.1 (3)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Program Purpose<br />

Program Facts &<br />

Objectives<br />

Benefits/Key Value<br />

Primary Target Audience<br />

Duration<br />

Approval Needed<br />

CONTINUOUS PROCESS<br />

IMPROVEMENT (CPI): 5S<br />

CPI is a business culture, a proactive mindset to continually seek out improvements<br />

and drive for Process Excellence: "Considering problems as opportunities, an<br />

inexhaustible source of progress". CPI is also a process supported by a set of tools &<br />

methodologies: Lean Six Sigma.<br />

This 1 day training session will provide attendees with 5S tools & techniques for waste<br />

elimination & efficiency/safety improvements. Coaching to help initiation of 5S<br />

project, further guidance provided during project with option to audit prior 5S<br />

projects via on-site visit or via virtual means.<br />

CPI/Lean Six Sigma is an active learning experience. Methods include:<br />

Key Lean Six Sigma theory modules detailing 5S steps<br />

LafargeHolcim on-site field visit utilizing new tools (organized locally)<br />

Live debriefings with site owners offering immediate feedback<br />

Simulations and games (interactive, out of chair)<br />

Visual Management and training briefings<br />

<br />

<br />

<br />

Learn how to identify and eliminate wastes through a structured 5 step method<br />

resulting in a more efficient, safer work environment<br />

Discover key Lean tools and techniques for conducting a successful 5S project<br />

from team formation to sustainability<br />

Develop a Continuous Improvement culture within LafargeHolcim and be an<br />

active contributor in the transformation engaged by the Group<br />

All LafargeHolcim employees that complete the 5S training will receive a certificate of<br />

completion. The 5S Project Leader will initiate a project in a shared work area.<br />

The 5S Project Leader objective is to involve a team:<br />

Carry out Field Visit (Gemba/SIPOC) in order to identify wastes in the area<br />

Work with team methodically through each of the 5S steps<br />

An audit of the 5S project area will be conducted once project is completed through:<br />

Proof of SOP and/or audit tool to maintain SUSTAIN phase<br />

Before and After pictures or documentation<br />

Acknowledgement of Health & Safety benefits by H&S Group<br />

The Acknowledgement Audit will be conducted by a CPI team member, CPI<br />

Community designee, and/or member of H&S Group.<br />

Individual Contributors, First line or Second line Managers with a drive to improve<br />

working conditions. Attendees willing to change processes and maturity to challenge<br />

existing situations (change agents). Shared work environments or team settings.<br />

Health and Safety conscious.<br />

8 hours<br />

Obtain approval from N+1, H&S and CPI Manager<br />

FOUNDATIONS FOR INDIVIDUAL CONTRIBUTORS<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!