7. RISKS, CONTINGENCIES AND VALUATION JUDGEMENTS<br />

Specialised Buildings Vehicles Plant and Infrastructure<br />

<strong>2018</strong> land equipment<br />

$ $ $ $ $<br />

Opening balance 254,400,000 32,742,517 417,341 2,186,212 62,908,162<br />

Purchases/(sales) - 120,631 445,754 416,581 739,555<br />

Specialised<br />

Cultural<br />

$<br />

242,062,900<br />

-<br />

Gains or losses recognised in net result:<br />

Impairments - - - - -<br />

Depreciation - (567,122) (110,580) (353,303) (1,343,878)<br />

-<br />

-<br />

Gains or losses recognised in other economic flows - other comprehensive income:<br />

Revaluations 56,276,607 - - - -<br />

Closing balance 310,676,607 32,296,026 752,515 2,249,490 62,303,839<br />

-<br />

242,062,900<br />

A description of significant unobservable inputs to Level 3 valuations is as follows:<br />

Asset Category Valuation technique Significant unobservable inputs<br />

Specialised Land • Market approach • Community Service Obligation (CSO)<br />

adjustment<br />

Buildings (specialised and heritage) • Current Replacement Cost • Direct cost per square metre<br />

• Useful life of buildings<br />

Vehicles • Current Replacement Cost • Cost per unit<br />

• Useful life of vehicles<br />

Plant and Equipment • Current Replacement Cost • Cost per unit<br />

• Useful life of plant and equipment<br />

Infrastructure (specialised and heritage) • Current Replacement Cost • Cost per unit<br />

• Useful life of infrastructure assets<br />

Specialised Cultural Assets • Current Replacement Cost • Cost per unit<br />

• Size of collections<br />

7.3 Contingent liabilities<br />

Contingent liabilities are:<br />

h<br />

h<br />

possible obligations that arise from past events, whose existence will be confirmed only by the occurrence or non-occurrence of<br />

one or more uncertain future events not wholly within the control of the entity; or<br />

present obligations that arise from past events but are not recognised because:<br />

h<br />

h<br />

it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligations;<br />

or<br />

the amount of the obligations cannot be measured with sufficient reliability.<br />

Contingent liabilities are not recognised in the balance sheet and are classified as either quantifiable or non-quantifiable. If quantifiable,<br />

contingent liabilities are measured at nominal value inclusive of GST payable.<br />

Non-quantifiable contingent liability<br />

A legal dispute has arisen between the Board and an Australian event promoter in relation to the existence of agreement to allow the<br />

conduct of a music event within Melbourne <strong>Gardens</strong> in 20<strong>19</strong>. While discussions on the matter are in progress, the amount payable, if any,<br />

cannot be reliably estimated at reporting date.<br />

ROYAL BOTANIC GARDENS BOARD VICTORIA — ANNUAL REPORT <strong>2018</strong>–<strong>19</strong> 107<br />