7. RISKS, CONTINGENCIES AND VALUATION JUDGEMENTS<br />
Specialised Buildings Vehicles Plant and Infrastructure<br />
<strong>2018</strong> land equipment<br />
$ $ $ $ $<br />
Opening balance 254,400,000 32,742,517 417,341 2,186,212 62,908,162<br />
Purchases/(sales) - 120,631 445,754 416,581 739,555<br />
Specialised<br />
Cultural<br />
$<br />
242,062,900<br />
-<br />
Gains or losses recognised in net result:<br />
Impairments - - - - -<br />
Depreciation - (567,122) (110,580) (353,303) (1,343,878)<br />
-<br />
-<br />
Gains or losses recognised in other economic flows - other comprehensive income:<br />
Revaluations 56,276,607 - - - -<br />
Closing balance 310,676,607 32,296,026 752,515 2,249,490 62,303,839<br />
-<br />
242,062,900<br />
A description of significant unobservable inputs to Level 3 valuations is as follows:<br />
Asset Category Valuation technique Significant unobservable inputs<br />
Specialised Land • Market approach • Community Service Obligation (CSO)<br />
adjustment<br />
Buildings (specialised and heritage) • Current Replacement Cost • Direct cost per square metre<br />
• Useful life of buildings<br />
Vehicles • Current Replacement Cost • Cost per unit<br />
• Useful life of vehicles<br />
Plant and Equipment • Current Replacement Cost • Cost per unit<br />
• Useful life of plant and equipment<br />
Infrastructure (specialised and heritage) • Current Replacement Cost • Cost per unit<br />
• Useful life of infrastructure assets<br />
Specialised Cultural Assets • Current Replacement Cost • Cost per unit<br />
• Size of collections<br />
7.3 Contingent liabilities<br />
Contingent liabilities are:<br />
h<br />
h<br />
possible obligations that arise from past events, whose existence will be confirmed only by the occurrence or non-occurrence of<br />
one or more uncertain future events not wholly within the control of the entity; or<br />
present obligations that arise from past events but are not recognised because:<br />
h<br />
h<br />
it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligations;<br />
or<br />
the amount of the obligations cannot be measured with sufficient reliability.<br />
Contingent liabilities are not recognised in the balance sheet and are classified as either quantifiable or non-quantifiable. If quantifiable,<br />
contingent liabilities are measured at nominal value inclusive of GST payable.<br />
Non-quantifiable contingent liability<br />
A legal dispute has arisen between the Board and an Australian event promoter in relation to the existence of agreement to allow the<br />
conduct of a music event within Melbourne <strong>Gardens</strong> in 20<strong>19</strong>. While discussions on the matter are in progress, the amount payable, if any,<br />
cannot be reliably estimated at reporting date.<br />
ROYAL BOTANIC GARDENS BOARD VICTORIA — ANNUAL REPORT <strong>2018</strong>–<strong>19</strong> 107<br />
<strong>Royal</strong> <strong>Botanic</strong> <strong>Gardens</strong> Board <strong>Victoria</strong> <strong>2018</strong>-<strong>19</strong> Financial <strong>Report</strong> Page 30