Royal Botanic Gardens Victoria Annual Report 2018-19
Royal Botanic Gardens Victoria Annual Report 2018-19
Royal Botanic Gardens Victoria Annual Report 2018-19
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 12: Overview of specific actions and performance measures <strong>2018</strong>–<strong>19</strong><br />
Action<br />
<strong>2018</strong>–<strong>19</strong> specific actions<br />
Overall progress against deliverables and<br />
performance measures <strong>2018</strong>–<strong>19</strong><br />
Long-term Strategy 3.2: Contributing to botanic gardens capacity building projects around the world<br />
Contribute to success of national and international<br />
networks such as BGANZ Council, BGANZ Vic,<br />
<strong>Botanic</strong> <strong>Gardens</strong> Engagement Network (BGEN)<br />
and <strong>Botanic</strong> <strong>Gardens</strong> Records Officer Network<br />
forums<br />
Contributed to development of new Global<br />
Strategy for Plant Conservation and the success of<br />
the International Association for <strong>Botanic</strong> <strong>Gardens</strong><br />
Actively participated on the BGANZ council, State<br />
executive group and national working groups, and<br />
achieved tangible outcomes in and for <strong>Victoria</strong>.<br />
Long-term Strategy 3.3: Completing the Cranbourne <strong>Gardens</strong> picture<br />
Implement Cranbourne <strong>Gardens</strong> Master Plan<br />
2016–2026<br />
Completed a feasibility study and developed a<br />
strategy to supplement lack of public transport<br />
Worked with City of Casey on design and funding<br />
for landscaped gateway treatment at corner of<br />
Ballarto Road and South Gippsland Highway<br />
New entrance signage installed for Cranbourne<br />
<strong>Gardens</strong> at Main Entry<br />
New VicRoads road signage installed for both<br />
Cranbourne <strong>Gardens</strong>’ entrances<br />
Private giving prospects identified and<br />
approached to contribute to development of<br />
Cranbourne <strong>Gardens</strong> Master Plan initiatives<br />
New interpretation installed for remnant<br />
vegetation, Southern Brown Bandicoot, and other<br />
rare species.<br />
Long-term Strategy 3.4: Developing the Melbourne <strong>Gardens</strong> site<br />
3.4.1 Confirm and complete future requirements for the<br />
new Herbarium by 30 June 2015 and seek funding<br />
to commence works by 1 July <strong>2018</strong><br />
3.4.2 Prepare the site concept plan by 31 March 2015,<br />
which will guide the development of major<br />
structural elements as the first step in completing<br />
the new 20-year review of the Melbourne <strong>Gardens</strong><br />
Master Plan by 31 December <strong>2018</strong><br />
3.4.3 Develop concept plans for the new ‘Engaging<br />
Science Precinct’ (now ‘Nature and Science<br />
Precinct’), including the new Herbarium and<br />
Nature Learning Centre, Great Melbourne<br />
Telescope and Observatory, as well as broader<br />
historical and contemporary science functions by<br />
30 June <strong>2018</strong><br />
Business Case for Nature and Science Precinct<br />
submitted in accordance with DELWP timeline.<br />
Community consultation for Melbourne <strong>Gardens</strong><br />
Master Plan successfully completed and<br />
stakeholder relationships effectively managed.<br />
Nature and Science Precinct Conceptual Building<br />
Master Plan with functional requirements<br />
completed<br />
Great Melbourne Telescope (GMT) House rising<br />
damp issues resolved<br />
GMT negotiations with Museum <strong>Victoria</strong> reach a<br />
successful conclusion<br />
GMT House retractable roof repaired and restored<br />
to functional capacity<br />
Further fundraising successful for GMT House<br />
restoration in collaboration with Museum <strong>Victoria</strong>.<br />
Long-term Strategy 3.6: Landscapes, living collections and horticulture all of high quality and shared widely<br />
3.6.2 Create new Fern Gully landscape at Melbourne<br />
<strong>Gardens</strong> by 30 June 20<strong>19</strong><br />
3.6.3 Create new Arid Garden at Melbourne <strong>Gardens</strong> to<br />
demonstrate garden alternatives in a dry climate<br />
by 30 June 20<strong>19</strong><br />
Health and Wellbeing <strong>Gardens</strong> constructed.<br />
Tecoma Pavilion conservation management plan<br />
prepared<br />
Precinct pathways upgraded<br />
Arid Garden design and documentation completed<br />
Permanent Seat installed<br />
Tecoma Pavilion undergoing restoration.<br />
ROYAL BOTANIC GARDENS BOARD VICTORIA — ANNUAL REPORT <strong>2018</strong>–<strong>19</strong> 59