06.10.2020 Views

atw - International Journal for Nuclear Power | 10.2020

Description Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information. www.nucmag.com

Description

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information.

www.nucmag.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>atw</strong> Vol. 65 (2020) | Issue 10 ı October<br />

There were 54 (53, +0.5 %) plants with 59,137 MWe<br />

gross and 55,235 MWe net capacity under construction<br />

worldwide at the end of the last year 2019. That means<br />

that in comparison to the figure of the previous year,<br />

there was 1 nuclear power unit more under construction<br />

worldwide, since 5 projects have been newly started and<br />

4 plants have attained first criticality. No project was<br />

suspended in 2019.<br />

Work started <strong>for</strong> the first units Taipingling 1 (PWR HPR<br />

1000, 1,200 MWe gross and 1,116 MWe net capacity) and<br />

Zhangzhou 1 (PWR HPR 1000, 1,212 MWe gross and 1,126<br />

MWe net capacity) in China, the second unit Bushehr 2<br />

(PWR VVER V-510K, 1,057 MWe gross and 974 MWe net<br />

capacity) in the Iran, Kursk 2-2 (PWR VVER V-1000 AES-92<br />

1,255 MWe gross and 1,175 MWe net capacity) in Russia,<br />

and Hinkley Point C-2 (PWR EPR-1750, 1,750 MWe gross<br />

and 1,630 MWe net capacity) in the United Kingdom.<br />

Active construction projects (numbers in brackets) listed<br />

are: Argentina (1), Bangladesh (2), Belarus (2), Brazil (1),<br />

China (11), Finland (1), France (1), India (7), Japan (2),<br />

Republic of Korea (4), Pakistan (2), Russia (6), Slovak<br />

Republic (2), Taiwan (2), Turkey (1), the United Arab<br />

Emirates (4), the United Kingdom (2), and the USA (2).<br />

Worldwide there were about 200 projects (200,<br />

+-0.0 %) in the concrete planning or application phase<br />

at the turn of the year 2019/2020. In addition, there<br />

are a further approx. 100 (100,0 %) declarations of intent<br />

by companies or government offices in other countries.<br />

523<br />

REPORT<br />

Station name Country Reactor type Capacity<br />

gross<br />

[MWe]<br />

Capacity<br />

net<br />

[MWe]<br />

Operator/<br />

Owner<br />

Supplier<br />

Construction start/<br />

First criticality/<br />

Long-term shutdown<br />

1 st Criticality, 1 st Grid connection and Start of commercial operation in 2019 Construction date<br />

Taishan 2 China EPR 1.750 1.660 CGNPG Framatome 2010<br />

Yangjiang 6 China ACPR-1000 1.080 1.000 GNPJVC CNNC 2013<br />

Shin-Kori 4 Korea APR-1400 1.400 1.340 KHNPC Doosan/CE 2009<br />

Novovoronezh 2-2 Russia VVER V-392M 1.200 1.115 Rosatom Rosatom 2009<br />

1 st Grid connection and Start of commercial operation in 2019<br />

- - - - - - - -<br />

1 st Criticality and 1 st Grid connection in 2019 Construction date<br />

- - - - - - - -<br />

1 st Criticality in 2019, only Construction date<br />

- - - - - - - -<br />

Restart after long-term shutdown in 2019<br />

Long-term shutdown<br />

- - - - - - - -<br />

Construction starts (first concrete in 2019)<br />

Construction start<br />

Taipingling 1 China HPR 1000 1.200 1.116 CGN NP CNNC 2019<br />

Zhangzhou 1 China HPR 1000 1.212 1.126 CNNP GZE CNNC 2019<br />

Bushehr 2 Iran VVER-1000<br />

AES-92<br />

1.057 974 NPP&DI Atomenergoexport<br />

Kursk 2-2 Russia VVER V-510K 1.255 1.175 Rosatom Rosatom 2019<br />

Hinkley Point C-2 United Kingdom EPR-1750 1.720 1.630 EDF/Joint V. Framatome 2019<br />

Permanent shutdowns in 2019<br />

| Tab. 2.<br />

<strong>Nuclear</strong> power plant units commissioned in 2019 (first criticality, first grid connection, and start of commercial operation), restart after long-term shutdown, start of construction,<br />

permanent shutdowns, long-term shutdowns and cancellation of projects (in brackets: original start of construction if project was suspended <strong>for</strong> a longer period).<br />

2019<br />

First criticality<br />

Philippsburg 2 Germany PWR 1.468 1.402 EnBW KK KWU 1984<br />

Fukushima Daini 1 Japan BWR 1.100 1.067 Tepco GE/Toshiba 1981<br />

Fukushima Daini 2 Japan BWR 1.100 1.067 Tepco GE/Hitachi 1983<br />

Fukushima Daini 3 Japan BWR 1.100 1.067 Tepco GE/Toshiba 1984<br />

Fukushima Daini 4 Japan BWR 1.100 1.067 Tepco GE/Hitachi 1986<br />

Genkai 2 Japan PWR 559 529 Kyushu EP MHI 1980<br />

Wolsong 1 Korea, Rep. Candu 685 657 KHNPC AECL 1982<br />

Bilibinsk 1 Russia LWGR 12 11 Rosatom Rosatom 1973<br />

Ringhals 2 Sweden PWR 963 852 Ringhals AB ABB Atom 1973<br />

Mühleberg Switzerland BWR 390 373 BWK GE 1971<br />

Chinshan 2 Taiwan, China BWR 636 604 Taiwan Pow. GE 1977<br />

Pilgrim 1 USA BWR 712 677 Entergy GE 1972<br />

Three Mile Island 1 USA PWR 1.021 976 Exelon B&W 1974<br />

Long-term shutdowns in 2019<br />

First criticality<br />

- - - - - - - -<br />

Project finally suspended in 2019<br />

Construction start<br />

- - - - - - - -<br />

Report<br />

<strong>Nuclear</strong> <strong>Power</strong> World Report 2019