• The internal access to Lot 1 between Right of Way 'B' and the northern<br />

boundary of Lot 2 DP 322290 shall be sealed.<br />

Cll Two Quality Assurance Certificates forms DE2010/1, DE2010/2 from a suitably<br />

qualified and experienced professional must be submitted to <strong>Council</strong>. The first<br />

must include pavement design and drainage of Right of Way 'B' and the<br />

second must cover the construction of Right of Way 'B'. These must be filled<br />

out and submitted to <strong>Council</strong> prior to issuing of the section 224 certificate.<br />

C12 The consent holder must submit design/construction plans to <strong>Council</strong> for<br />

acceptance prior to carrying out any construction work required by this<br />

consent. All work associated with Right of Way 'B' must be designed,<br />

constructed and completed to the satisfaction of the <strong>Council</strong>'s Development<br />

Engineering Manager, and must be in accordance with <strong>Council</strong>'s standards as<br />

set out in the Code of Practice for Land Development and Subdivision and<br />

must be at the consent holders expense. The submitted plans must include:<br />

• Pavement design- based on testing of existing ground.<br />

• Disposal of stormwater including all structures and erosion control.<br />

• Surface treatment- i.e. sections to be sealed.<br />

Water Supply<br />

C13 The water line identified as enclosed within easement 'C' on the application<br />

plan for SP/0076/12 shall be registered on the title for Lot 4 DPS 82776 in<br />

favour of Lot 2. These easements are to have a minimum 2m width.<br />

Advisory Notes<br />

It is suggested that an agreement be entered into between the owner of the<br />

water bore and the owner of Lot 2 that identifies the rights and obligations of<br />

the parties and addresses the following issues (but not be limited to):<br />

• Future maintenance responsibilities including access to the water line<br />

for maintenance and basis of cost sharing for the maintenance of the<br />

bore.<br />

• Maximum daily water quantity to be supplied to Lot 1.<br />

• Notice period in the case of discontinuance of the bore supply.<br />

Users of the bore water supply located in Lot 4 DPS 82776 are advised that it<br />

is their responsibility to determine the suitability of whether the water quality<br />

meets the standards for potable use.<br />

C14 That the consent holder must submit to <strong>Council</strong> written and signed<br />

confirmation, either,<br />

a) that there are no water supply pipelines crossing boundaries between<br />

Lots 1 and 2,<br />

or;<br />

Report to <strong>Regulatory</strong> <strong>Committee</strong> Meeting- (19 November 2012)<br />

Thornton Ridge Trust<br />

Page 23<br />

155