Readers’ Platform<br />

Help Us Help<br />

by K. Subramanian<br />

K. Subramaniam has been executive director –<br />

Technical for Johnson Lifts since 1988. He has 43<br />

years of lift-industry experience.<br />

Subramaniam began in<br />

the Design & Development<br />

Department of Best<br />

& Crompton Engineering<br />

in 1964 then worked with<br />

ECE Industries as regional<br />

manager – South from 1980<br />

until 1988. He received his<br />

BS in Electrical Engineering<br />

from Kerala University in 1964.<br />

36<br />

ELEVATOR WORLD <strong>India</strong> • 4th Quarter 2010 •<br />

With the economic growth in realestate<br />

and building businesses in<br />

<strong>India</strong>, barring the recent economic<br />

situation, the elevator market has<br />

synergistically seen much growth.<br />

Many companies, both local and foreign,<br />

have strengthened/established<br />

their operations in <strong>India</strong>. One can see<br />

the impact by way of technological<br />

and cosmetic changes in presentday<br />

elevators, which include microprocessor<br />

and serial communication<br />

electronic controls, fancy shapes in<br />

the lift cabin with comparatively<br />

expensive panels with stainless steel<br />

and glass, lobby doors with various<br />

designs in stainless steel, fancy and<br />

colorful call-button fixtures and indicators<br />

in the lobby.<br />

The elevator is one of the most<br />

essential and critical utilities of the<br />

building. It is needless to emphasize<br />

that elevator installation must be<br />

done with all due care to ensure that,<br />

as an important asset of the building,<br />

it has a minimum life of at least 20<br />

years before one could think of renovation.<br />

Similar to bricks, cement,<br />

steel rods, etc. that go into the main<br />

structure of the building, elevators<br />

also have many parts and accessories<br />

that are assembled and embedded at<br />

the site to give the systems their final<br />

shapes.<br />

For a good installation at site, there<br />

are some prerequisite work sequences<br />

and required times. In elevator contracts,<br />

it is a work order for supply and<br />

installation of the lifts. There is no<br />

avenue to use to buy the materials<br />

from one agency and get them installed<br />

by another. Though with great<br />

efforts this is technically possible, as<br />

an industry practice, it is not done.<br />

Storage of materials is one of the<br />

problems that can provide lots of<br />

woes. This is a predicament faced by<br />

the customer, as well the elevator<br />

company.<br />

<strong>Elevator</strong> materials are not to be<br />

equated to tiles, cement or bricks.<br />

So-called elevator materials can be<br />

ordinary steel structures, certain<br />

machined and finished steel com -<br />

ponents like rails, electromechanical<br />

assemblies like the main machine,<br />

door operators, limit switches,<br />

wheels, controllers, indicators and<br />

call-button assemblies that are as<br />

sensitive as TVs and computers.<br />

Apart from this, there are items like<br />

car body panels, door panels made<br />

out of stainless steel and glass with<br />

specific, expensive and exotic finishes<br />

and tints.<br />

Handling and storage of lift materials<br />

needs more understanding of the<br />

complex nature of the accessories<br />

and assemblies. The same care with<br />

which the specification was discussed<br />

and finalized for the car body<br />

and doors is required to preserve the<br />

finishes by having good storage<br />

provisions at a site. This aspect is not<br />

given its due priority and importance.<br />

Spending some time in finding a<br />

mutually agreed solution will go a long<br />

way in providing a good installation.<br />

It goes without saying that that<br />

depends on how the materials are<br />

safeguarded against damages at site.<br />

Building construction methods<br />

and systems have also changed due<br />

to technological innovations and<br />

improvements. A lot of focus is given<br />

toward speeding up the work and<br />

completing the project quicker. Installation<br />

of the lifts is a mini project<br />

within the main project. It is an<br />

activity pervading in all floors right<br />

from the bottom to the top level, and<br />

even beyond where the machine<br />

room is normally located.<br />

The guide rails, machine and other<br />

accessories at the machine room,<br />

landing-door assemblies at all floor<br />

levels, call buttons, indicators, etc.<br />

are all fixed/embedded at the site.