Alignment of the various accessories,<br />

installing the ropes, wiring the call<br />

buttons, indicators, etc. are done at<br />

the next stage. These activities involve<br />

interacting with others working in<br />

the building. Normal hurdles include:<br />

◆ Plumb of the duct allotted for the<br />

lift (lift shaft)<br />

◆ Preventing the pit becoming a<br />

debris receptacle<br />

◆ Final decisions on floor levels<br />

◆ Details on the decorative fascia<br />

surrounding the lift entrances at<br />

all floors<br />

Avoiding major errors in the dimensional<br />

plumb of the lift shaft will<br />

go a long way in installation, saving<br />

time and money spent on reworking<br />

and alterations. The same holds for<br />

the positioning of the openings in all<br />

the floors without offset. “Out of<br />

plumb” and “offset” are two terms<br />

used or encountered only by elevator<br />

engineers and technicians. Sometimes<br />

it is taken for granted that<br />

nothing could go wrong in the construction<br />

of the lift shaft right from<br />

the pit to the machine room. The<br />

plumbness of walls from floor to floor<br />

may not have an impact for other<br />

activities in the building, but plumbness<br />

within allowable limits is a must<br />

for the lift shaft. Small errors from<br />

floor to floor accumulate. Organizing<br />

a checklist and periodical verifi -<br />

cation will help avoid the waste of<br />

time and money. There have been<br />

instances where the lift shaft was<br />

severely out of plumb – to the extent<br />

of installing a lift cabin with a lesser<br />

capacity, discarding the original<br />

cabin and its accessories.<br />

Commencement and completion<br />

of the lift installation is another<br />

issue. The commencement of the<br />

installation requires some prerequisites.<br />

The construction of the shaft,<br />

machine room and pit as per the<br />

general arrangement drawing (GAD)<br />

(mutually agreed and approved) is a<br />

major perquisite. Only in a completed<br />

shaft and machine room will<br />

the installers be able to decide on the<br />

various location centers for guide<br />

rails, machine position and rope<br />

holes, entrance frame and its sills,<br />

etc. Lift installation cannot be done<br />

on a floor-to-floor basis as a parallel<br />

activity along with the progress of<br />

construction of the building. Again,<br />

the logic of involving more people to<br />

speed up the work does not yield the<br />

desired result; on the other hand, it<br />

may lead to quality and safety issues.<br />

As an industry practice, the details<br />

of the work connected with the lift<br />

shaft, pit and machine room are<br />

listed in the GAD. Often, the building<br />

site engineers/supervisors are unaware<br />

of the details leading to unwanted<br />

disputes and delays. An initial coordination<br />

meeting will help understand<br />

the various scopes of work<br />

and enable the elevator installation<br />

team to get the necessary support to<br />

execute the work.<br />

Many small items may be left out,<br />

like finishing the entrance opening<br />

in the floor levels, making the pit<br />

good, windows and ventilators in the<br />

machine room, the door and steps<br />

for the machine room, machineroom<br />

flooring, etc. Though these are<br />

very minor jobs, they are nevertheless<br />

a big handicap for the lift installation<br />

team in continuously progressing<br />

with the work.<br />

Another important issue is the<br />

time taken to decide on the final finished<br />

floor levels and details of decorative<br />

fascia work. As an industry<br />

practice, the installation of the lobby<br />

door frames, sills, and call-button<br />

and indicator boxes are located and<br />

installed in the initial stage of the<br />

installation work. This is mainly to<br />

facilitate the completion of the fascia<br />

work (including the wiring) to be com -<br />

pleted by the time the lift installation<br />

is finished. In most cases, fascia<br />

work and floor levels put the brakes<br />

on the progress of the lift installation<br />

work. Any lapse or misfire spoils the<br />

aesthetics of the lift entrance. Installation<br />

completion commitments depend<br />

largely on the decisions on<br />

floor levels and the fascia.<br />

For the elevator industry to be<br />

customer friendly, allow us to enjoy<br />

contractor-friendly ambience. �<br />

• Issue 4, Volume 3 • elevatorworldindia.com<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!