27.12.2012 Views

0 - Hanford Site

0 - Hanford Site

0 - Hanford Site

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

•<br />

•<br />

RPP-24544 REV Id<br />

• Subcontractor Calculation Review Check list<br />

DBVS OGTS Calculations<br />

Subject: Off-Gas Treatment System BY-Pass Thermal Hydrau lic Analysis<br />

The subject document has been reviewed by the undersigned.<br />

The checker reviewed and verified the following items as applicable.<br />

Page 1 of 1<br />

Documents Reviewed: 145570-D-CA-056, Rev 1, By-Pass Thermal Hydraulic Analysis<br />

Analysis Performed By: AMEC<br />

• Design Input<br />

• Basic Assumptions<br />

• Approach/Design Methodology<br />

• Consistency with item or document suppo rted by the calculation<br />

• Conclusion/Results Interpretation<br />

• Impact on existing requirements<br />

Checker (printed name, signature, and date)<br />

Lois Payn^\`== ^^ ^7no _ ^/ 6^<br />

Organizational Manager (p rinted name, signature an<br />

ate)<br />

David 1I Shuford 24 ! S/ 171Z1416 ,<br />

A5-634

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!