l:Abl VVUOD Et PARTNERS<br />

Conaultln g Engineers<br />

W. Eastwood<br />

A. A. Wood<br />

A. G. Burdett<br />

R. C. A. Eastwood<br />

Geoffrey Spir<br />

C. S. Greaves<br />

A. J. Clough<br />

J. A. Strange<br />

Consu/t~.t :<br />

A. L. Percy<br />

E Eng.. Ph.D.. F E~g. F ICE.<br />

F.I.S;rucl E, F G S, M.Coe.s.L<br />

B E,g. PhD.. CE,g. FI.C.E..<br />

F.I $1rucl E.. M.I.W E.$. M Cons E.<br />

G M.. B.Sc(Eng),CEn;.MICE.<br />

B$. C.Eng.. M IC E, MI $1ru(:! E.<br />

M.T.ch.(Hon.|. R.SC.. C.Eet.. F.I.C E..<br />

F.I Struc:.E.. F.I.Mue.E.. M.R.T.P.I.<br />

Sheffield Wednesday Football Club Ltd.,<br />

Hillsborou£h,<br />

SKE FF IELD. $6<br />

Our Ref :<br />

Your Ref :<br />

Invoice No. :<br />

To PTofesstonal Services in Investlgatlng<br />

~ossible Schemes to Roof over <strong>the</strong> Kop, Includi~<br />

Extension to Accommodate an Addltlorml 5000<br />

Spectators.<br />

Carrying out survey of levels at top of kop<br />

and at <strong>the</strong> back of <strong>the</strong> bank so as to design<br />

staircases, foundations etc.<br />

Outline design of a roof to cover <strong>the</strong> kop in<br />

its present form. Sufficient calculations to be<br />

able to estimate costs. Preparing scheme<br />

drawings.<br />

Outline design of a roof to cover a ’squared<br />

off’ kop with ~aw structural deck beneath to<br />

accommodate eztra 5000 spectators. PTepartng<br />

scheme drawings and cost estimates.<br />

Preparing a ’half way house’ scheme with <strong>the</strong><br />

roof extended, but <strong>the</strong> with <strong>the</strong> structural deck<br />

not included in <strong>the</strong> first stage. Cost estimate.<br />

Advisory report dated 4 September 1981.<br />

Partner’s fine<br />

Senior ig~idrtered Engineer<br />

Chartered Engineer<br />

Draftsman<br />

Junior Draftsman<br />

V.A.T. @ 15%<br />

48 hours @ £12.80<br />

2 hours @ £ 8.40<br />

44~ 39 hours : : 4. 5.00 O0<br />

Registered in England - No. 1134531<br />

V.A.T. Registration No. 172 9231 61<br />

With ~-~-o!i~en~n -<br />

BOWMAKER HOUSE<br />

23 KINGFIELD ROAD<br />

SHEFFIELD $11 9AS<br />

Tel.: (0742) 583871<br />

3540<br />

30 December, 1981<br />

£<br />

II0.00<br />

588.80<br />

18.80<br />

222.50<br />

158.00<br />

£1096.10<br />

184.41<br />

£1260.51