pressure) Left abutment 2 5<br />
Weir gauge<br />
(seepage water)<br />
Right abutment - 1<br />
Central section 2 2<br />
Left abutment - 1<br />
Bench marks<br />
Crest Lc/50 Lc/20<br />
(Displacements) Berm (eventual) Lb/50 Lb/20<br />
(*) Obs. Lc and Lb correspond to the length of the crest and the downstream berm in<br />
meters.<br />
It is important to point out that the total amount of instruments recommended in this table<br />
is the minimum, and in the case of dams with foundations deserving special attention, with an<br />
intricate geology incorporating faults and folds directly under the dam, it is important to install<br />
some more instruments.<br />
Considering that for small dams there are usually small support for their monitoring<br />
maintenance it is recommended to install standpipe piezometers, if possible, which normally<br />
present a performance compatible with that of the dam itself. These instruments can be<br />
successfully installed in soils with a permeability coefficient higher or equal to 10 -6 cm/s, as<br />
already discussed. It is also important to install one or more weir gauge to monitor the<br />
leakage.<br />
Recommendations for Piezometer Measurements<br />
In the location of the piezometers at the dam foundation, impervious core or horizontal<br />
filter, the following recommendations are important to be attended:<br />
� To install foundation piezometers upstream and downstream of the grout curtain or<br />
the cutoff trench, in order to calculate its performance;<br />
� Perform the installation of a piezometer at the upstream drain blanket, in order to<br />
know the water head at the drainage system;<br />
� In dams with PHC = 3 install some piezometers at the central core, near the axis of<br />
the dam, to evaluate the maximum pore pressures and the phreatic line location;<br />
� If the geological investigations showed a fault crossing the foundation from upstream<br />
to downstream it is very important to install some foundation piezometers along this fault,<br />
which usually implies in a preferential seepage way.<br />
In the following sketch and expressions are presented the location of a grout curtain or<br />
the cutoff trench at the foundation of an earthfill dam, and how it is possible to calculate its<br />
efficiency considering the water head drop.<br />
103