[4] FEMA – “Technical Manual: Conduits through Embankment Dams, Best Practices for Design, Construction, Problem Identification and Evaluation, Inspection, Maintenance, Renovation, and Repair,” U.S. Federal Emergency Management Agency FEMA 484DVD/September 2005. [5] HANSEN, K.D AND KAHLER, C.M. “RCC Tests, Testing , and Test Sections – Lessons Learned,” Journal of Dam Safety, ASDSO, Vol.2, No. 1 pp. 12-17. 2004 [6] JSIDRE– “Design Guideline for Agricultural Land Improvement Projects – Tameike Rehabilitation”, Japan. 2006 [7] KOERNER, R.M. AND HSUAN, Y.G. – “Lifetime Prediction of Polymeric Geomembranes used in New Dam Construction and Dam Rehabilitation”, Proc. ASDSO Dam Safety Conference, Lake Harmony 2003 [8] LAUTRIN, D.– Vieillisement et réhabilitation des petits barrages en terre, Cemagref Editions, Paris, 240 p. 2003 [9] LEWIS, B. – “Minimum Energy Design Using Grassed Spillways”, ASDSO Dam Safety Conference, Boston. 2006 [10] LONDE, M. PIERRE, “Lessons from Earth Dam Failures”, News and Views, British National Committee on Large Dams (London August 1983). [11] MILLER, D.J., JEWELL, A.C., AND SMITH, K. – “Piping and internal erosion control measures at Tongue River Dam, Montana,” Proc. Assoc. State Dam Safety Officials, Snowbird, UT, USA, Sept 11. 2001 [12] MILLER, S.P.; RALSTON, D.C.– “Embankment Overtopping – Case Histories”, R.M. Ragan editor. Hydraulic Engineering Proc. Of the 1987 Conf. on Hydraulic Engineering, Virginia, ASCE. 1987 [13] NRCS– “Dimensioning of Filter Drainage Diaphragms for Conduits According to TR 60”, Natural Resources Conservation Service, Technical Note No. 709, U.S. Dept. Agriculture. 1989 [14] NRCS– “Earth Dams and Reservoirs”, Natural Resources Conservation Service, Technical Release No. 60 (TR 60), U.S. Dept. Agriculture. 1989 [15] SHERARD, J. L., DUNNIGAN, L. P., "Filters and Leakage Control in Embankment Dams, Symposium on Seepage and Leakage from Dams and Impoundments, ASCE, May. 1985 [16] SHERARD, J. L., DUNNIGAN, L. P., "Critical Filters for Impervious Soils, Journal of Geotechnical Engineering, ASCE, July. 1989 [17] SHERARD, J. L., DUNNIGAN, L. P., AND TALBOT, J. R., "Basic Properties of Sand and Gravel Filters," Journal of Geotechnical Engineering, ASCE, June. 1984a [18] SHERARD, J. L., DUNNIGAN, L. P., AND TALBOT, J. R., "Filters for Silts and Clays," Journal of Geotechnical Engineering, ASCE, June. 1984b [19] SINGH, N., DOUGLAS, R., AHLFIELD, S. AND GANT, M.– “Construction of a Roller- Compacted Concrete Upstream Blanket and Plastic Concrete Cutoff Wall at Cleveland Dam,” Proc. Assoc. State Dam Safety Officials, Orlando Florida, USA, Sept 22-27. 2005 138
[20] SMEC– “Draft Guidelines for Managing Small Dams”, SMEC Australia Pty Ltd. 2006 [21] TANI AND FUKUSHIMA – “Sampling Studies of Rehabilitation Works for Aged Fill Dams,” 2007, The Agricultural Research Institute Report, Japan. 2007 [22] BUREAU OF RECLAMATION – “Design of Small Dams”, United States Department of the Interior, A Water Resources Technical Publication, Third Edition, 1987. Pages 463 to 464. 1987 [23] USACE– “Technologies and Techniques for Drainage Pipe Maintenance and Repair – A Practical Guide for Technology Selection”, prepared by Civil Engineering Research Foundation, U.S. Army Corps of Engineers, May. 2001 [24] VELLONE, D.A. AND STIER, M.A.– “Rehabilitation an Aging Embankment Dam with RCC for Overtopping Protection”, Proc. ASDSO Dam Safety Conference, New Orleans. 2005 [25] WEAVER, K. AND BRUCE, D.– “Dam Foundation Grouting”, American Soc. Civil Engineers Press No. 0-7844-0764-9, Reston, Virginia, U.S.A. 2007 [26] VAN SCHALKWYK, A.– “Erosion of rock in unlined spillways” Paper Release 37 as part of The Eighteenth Congress on Large Dams, Durban 1994, Volume IV, Question 71. 1994 [27] KIRSTEN, H.A.D. – A classification system for excavation in natural materials. The Civil Engineer of South Africa, July 1982. Pages 293 – 308. 1982 139