Fig. 2.13 - Photograph of Neusberg weir<br />

Normally RCC dams are constructed with stepped downstream faces, but for Neusberg<br />

Weir a smooth downstream face was adopted. This decision was made to accommodate the<br />

construction constraint associated with frequent erection and stripping of shutters to form the<br />

required low step. The shape of the Neusberg Weir is shown in the following cross section.<br />

Fig. 2.14 – Typical section through Neusberg spillway<br />

The total cementitious content for RCC was 193 kg/m 3 consisting of 58 kg/m 3 ordinary<br />

Portland cement and 135 kg/m 3 pulverized fuel ash, 106 kg/m 3 water and 761 kg/m 3 sand were<br />

added. The crushed granite aggregate consisted of 402 kg/m 3 through the 4,75mm – 19mm<br />