12.02.2013 Views

SMALL DAMS PETITS BARRAGES

SMALL DAMS PETITS BARRAGES

SMALL DAMS PETITS BARRAGES

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tube-a-manchettes<br />

injection system for<br />

grouting<br />

Grout curtain<br />

and hydraulic pile<br />

drivers<br />

Drilling with special<br />

packer rod tube and<br />

grouting through rubber<br />

sleeve<br />

Drilling holes, primary,<br />

then secondary and<br />

tertiary holes.<br />

Grouting of holes with<br />

cement grout.<br />

Cement<br />

Cement<br />

rock foundation i.e. a<br />

non-positive cutoff.<br />

Only for rock<br />

foundation Figure 7.5<br />

Only for rock<br />

foundation Figure 7.6<br />

and Figure 7.12 and<br />

7.13<br />

Fig. 7.12: Vertical rock joints shown with angled grout hole orientation<br />

(Penn Forrest Dam Rehabilitation, USA)<br />

Fig. 7.13 – Grout holes are drilled at optimized angles for rock joints patterns (image<br />

from www.advancedconstructiontechniques.com/).<br />

127

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!