12.02.2013 Views

SMALL DAMS PETITS BARRAGES

SMALL DAMS PETITS BARRAGES

SMALL DAMS PETITS BARRAGES

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fig.5.17 – Standard cross section view of inclined impervious zone<br />

Table 5.25 – Reference dimensions for reservoirs with an inclined impervious zone.[8]<br />

Height of dam H (m) - 5 5 - 10 10 - 15 Summary<br />

Height from foundation surface<br />

to water level H1 (m)<br />

-3,3 3,3-7,8 7,8-12,2<br />

Assumed from dam<br />

height<br />

Major differences exist<br />

Planned overflow depth h1 (m) 0,3-0,5 0,5-0,8 0,8-1,2<br />

in accordance with<br />

position and design of<br />

spillways.<br />

In accordance with<br />

Freeboard h2 (m) 1,0-1,2 1,2-1,4 1,4-1,6 formulas (3.3.5) and<br />

(3.3.6)<br />

Dam crest width B (m) 2,0-3,0 3,0-4,0 4,0-5,0<br />

In accordance with<br />

formula (3.3.7)<br />

Gradient n1 (%) 1,5-1,8 1,8-2,1 2,1-3,0 1.5-3.0<br />

Front Slope<br />

Step width b (m) 0-1,5 1,5 0,2<br />

Minimum of 1 m if dam<br />

is to be stepped<br />

Distance from dam<br />

crest h3 (m)<br />

0,3-0,5 ≥ 0,5 ≥ 0,5 ≥ 0.3 m<br />

Dam crest width d1<br />

(m)<br />

1,5-1,8 1,8-2,4 2,4-3,5 1.5–3.5 m<br />

Distance from front<br />

d4 (m)<br />

1,5 1,5 ≥ 1,5 ≥ 1.5 m<br />

Impervious Zone<br />

Where n2=n1-0.1<br />

n3=n2-0.2<br />

Upper excavation<br />

width d2 (m)<br />

Lower excavation<br />

width d3 (m)<br />

Depth of<br />

excavation h4 (m)<br />

1,1-1,3 1,3-2,1 2,1-3,2<br />

d3=1/2 d2<br />

Depends on soil quality<br />

of foundation surface.<br />

Figures here included only<br />

for reference.<br />

Rear gradient n4 (10%) 1,5-1,8 1,8-2,1 2,1-2,5 1.5-2.5<br />

Note: Construction of drains may be considered depending on on-site conditions.<br />

(3.3.5) In case R ≦ 1.0 m , h2 = 0.05 H2+1.0<br />

(3.3.6) In case R > 1.0 m , h2 = 0.05 H2+R<br />

Where R :run-up height of waves(m)<br />

(3.3.7) In case B ≥ 3.0 m , B = 0.2 H + 2.0<br />

5. Experience of Czech Republic<br />

The cross section shape of the dam shall be determined in accordance with calculations<br />

to ensure its stability. The standard cross section diagram shown in Figure 5.18 and Table<br />

5.26 shall be used in determining the preliminary cross section shape of the small dam<br />

Table 5.26 – Recommended slopes for small dams in Czech Republic.<br />

Dam sealing Dam Categorization of earths Slopes<br />

90

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!