- Page 1 and 2:
SMALL DAMS Design, Surveillance and
- Page 3 and 4:
FOREWORD The ICOLD - International
- Page 5 and 6:
ACKNOWLEDGEMENT The Ad Hoc Committe
- Page 7 and 8:
FOREWORD ACKNOWLEDGEMENT SUMMARY TA
- Page 9 and 10:
5.5.5 Compaction in confined areas
- Page 11 and 12:
7.2.1 Introduction 7.2.2 Spillway c
- Page 13 and 14:
1. SMALL DAMS DEFINITION AND CLASSI
- Page 15 and 16:
2 Fig. 1.2 - Relationship H . V wit
- Page 17 and 18:
1.3 REFERENCES [1] French Committe
- Page 19 and 20:
2.3 ZONED EARTHFILL DAMS In arid pa
- Page 21 and 22:
sloping core guarantees water impou
- Page 23 and 24:
Fig. 2.11 - Hlinky Concrete Gravity
- Page 25 and 26:
Fig. 2.13 - Photograph of Neusberg
- Page 27 and 28:
The gabion dam as the gabion retain
- Page 29 and 30:
Some inflatable dams are operated b
- Page 31 and 32:
3.1 INTRODUCTION 3. SAFETY OF SMALL
- Page 33 and 34:
Condition Effect on safety 13. Dama
- Page 35 and 36:
Fig. 3.2 - Massive dam break overto
- Page 37 and 38:
and suffusion or internal instabili
- Page 39 and 40:
downstream part of the embankment m
- Page 41 and 42:
small dam impounding a lot of water
- Page 43 and 44:
Whenever the Supervising Authority
- Page 45 and 46:
emergency management organizations
- Page 47 and 48:
c) The decommissioning plan should
- Page 49 and 50:
5.1 INTRODUCTION 5. FEATURES OF THE
- Page 51 and 52:
5.2 DESIGN FLOODS Inadequate flood
- Page 53 and 54:
downstream slope will show seepage
- Page 55 and 56:
Fig. 5.2 - Design Freeboard 5.4.3 F
- Page 57 and 58:
2 U f Fe S 1400 D Where Uf is the d
- Page 59 and 60:
Maximum compaction is obtained at c
- Page 61 and 62:
characteristic must be determined.
- Page 63 and 64:
5.6.1 Foundation Watertightness The
- Page 65 and 66:
� A continuous vertical chimney d
- Page 67 and 68:
Thickness of pervious layer Thick D
- Page 69 and 70: t 5.7.1.4 Practical Considerations
- Page 71 and 72: It is generally accepted that cohes
- Page 73 and 74: � Simple Bishop (1955) � Spence
- Page 75 and 76: � The elements for surface draina
- Page 77 and 78: The supporting layer for the rip-ra
- Page 79 and 80: For very small reservoirs (fetch of
- Page 81 and 82: The junction of the downstream slop
- Page 83 and 84: Fig. 5.14 - Hongshiyan homogenous d
- Page 85 and 86: material has been left in place or
- Page 87 and 88: The homogeneous dam is recommended
- Page 89 and 90: [3] OL and OH soils are not recomme
- Page 91 and 92: part (core) lies in the zone (Fig.
- Page 93 and 94: 6. GUIDELINES ON SURVEILLANCE OF SM
- Page 95 and 96: cases the owner may retain the serv
- Page 97 and 98: Surface displacement on an embankme
- Page 99 and 100: Fig. 6.1 - Leakage measurement usin
- Page 101 and 102: Water Level Sounder - Details of th
- Page 103 and 104: pressure) Left abutment 2 5 Weir ga
- Page 105 and 106: Fig. 6.9 - Recommended standpipe pi
- Page 107 and 108: the others weir gauges need to be i
- Page 109 and 110: � Earthquakes sensible at the dam
- Page 111 and 112: APPENDIX INSPECTION CHECKLIST FOR S
- Page 113 and 114: Exposed reinforcement � The condu
- Page 115 and 116: These spillways can be lined or unl
- Page 117 and 118: flowing water. Flowing water with h
- Page 119: Fig. 7.3 - Installation of the arti
- Page 123 and 124: complete construction was in 2001,
- Page 125 and 126: In some cases, the downstream face
- Page 127 and 128: Tube-a-manchettes injection system
- Page 129 and 130: 7.3.5 Slope Protection Measures 7.3
- Page 131 and 132: Pipe Rehabilitation SLIPLINING MODI
- Page 133 and 134: Conditions Pros Cons Comments types
- Page 135 and 136: Embankment dams that have properly
- Page 137 and 138: and minimize erosion. Design of sui
- Page 139 and 140: [20] SMEC- “Draft Guidelines for
- Page 141 and 142: present visual information. It must
- Page 143 and 144: Fig. 8.1 - Three small dams in casc
- Page 145 and 146: Social Disruption low (rural area)
- Page 147 and 148: Fig. 8.4 - Flood water level after
- Page 149: 8.9 REFERENCES [1] BURREC (1994) -