01.03.2013 Views

EUROCODE 2 WORKED EXAMPLES - Federbeton

EUROCODE 2 WORKED EXAMPLES - Federbeton

EUROCODE 2 WORKED EXAMPLES - Federbeton

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EC2 – worked examples 2-6<br />

Set B (verification of concrete structural elements of foundations)<br />

1.0·Gk + 1.5·Qk,w<br />

1.35·Gk + 1.5· Fk,w + 0.75·Qk,n + 1.05·Qk,es<br />

1.35·Gk + 1.5·Qk,n + 1.05·Qk,es + 0.9·Fk,w<br />

1.35·Gk + 1.5·Qk,es + 0.75·Qk,n + 0.9·Fk,w<br />

Approach 2<br />

The same combinations used for the superstructure (i.e. Set B) are used.<br />

Approach 3<br />

Factors from Set C for geotechnical actions and from Set B for other actions are used in one<br />

calculation. This case, as geotechnical actions are not present, can be referred to Set B, i.e. to<br />

approach 2.<br />

EXAMPLE 2.4. ULS combinations of actions on a reinforced concrete retaining wall<br />

[EC2 – clause 2.4]<br />

Table of Content<br />

Fig. 2.8. Actions on a retaining wall in reinforced concrete<br />

EQU - (static equilibrium of rigid body: verification of global stability to heave and sliding) (Set A)<br />

Only that part of the embankment beyond the foundation footing is considered for the<br />

verification of global stability to heave and sliding (Fig. 2.9).<br />

1.1·Sk,terr + 0.9·(Gk,wall + Gk,terr) + 1.5·Sk,sovr<br />

Fig. 2.9. Actions for EQU ULS verification of a retaining wall in reinforced concrete

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!