EUROCODE 2 WORKED EXAMPLES - Federbeton
EUROCODE 2 WORKED EXAMPLES - Federbeton
EUROCODE 2 WORKED EXAMPLES - Federbeton
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
EC2 – worked examples 6-53<br />
Table of Content<br />
Fig. 6.45 SW/0 arrangement for Load Step 6<br />
plus a SW/2 train on the right track with the following longitudinal<br />
arrangement:<br />
Fig. 6.46 SW/2 arrangement for Load Step 6<br />
− STEP 8: Variable loads for max bending moment on second span (x = 32.305 m);<br />
the applied load is a LM71 model on the left track with the following<br />
longitudinal arrangement:<br />
Fig. 6.47 LM71 arrangement for Load Step 7<br />
plus a SW/2 train on the right track with the following longitudinal<br />
arrangement:<br />
Fig. 6.48 SW/2 arrangement for Load Step 7