EC2 – worked examples 6-31<br />
Table of Content<br />
Fig. 6.20. Schematic placement of reinforcements.<br />
Nodes verification<br />
Concentrated nodes are only present at the pedestal pile and on the piles top. In these latter,<br />
the compressive stresses are very small as a consequence of the piles section large area.:<br />
A 2333000<br />
σc = = = 4.64 N mm<br />
2 2<br />
π ⋅rπ⋅400 2