EC2 – worked examples 6-31<br />

Table of Content<br />

Fig. 6.20. Schematic placement of reinforcements.<br />

Nodes verification<br />

Concentrated nodes are only present at the pedestal pile and on the piles top. In these latter,<br />

the compressive stresses are very small as a consequence of the piles section large area.:<br />

A 2333000<br />

σc = = = 4.64 N mm<br />

2 2<br />

π ⋅rπ⋅400 2