01.03.2013 Views

EUROCODE 2 WORKED EXAMPLES - Federbeton

EUROCODE 2 WORKED EXAMPLES - Federbeton

EUROCODE 2 WORKED EXAMPLES - Federbeton

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EC2 – worked examples 6-52<br />

Table of Content<br />

gdrain = 1.25×9.5 = 11.875 kN/m;<br />

ballast retaining walls (with a cross section area of 0.25 m 2 and unit weight of<br />

25 kN/m 3 )<br />

ducts:<br />

gwalls = 25×0.25 = 6.25 kN/m for each;<br />

gducts = 3 kN/m for each;<br />

border curbs (with a cross section area of 0.1 m 2 and unit weight of<br />

25 kN/m 3 ):<br />

noise barriers:<br />

greinf beam = 25×0.25 = 6.25 kN/m for each;<br />

gbarriers = 8.00 kN/m for each;<br />

− STEP 6: Variable loads for maximum bending moment on first span (x = 6.18 m);<br />

the applied load is a LM71 model on the left track with the following<br />

longitudinal arrangement:<br />

Fig. 6.43 LM71 arrangement for Load Step 5<br />

plus a SW/2 train on the right track with the following longitudinal<br />

arrangement:<br />

Fig. 6.44 SW/2 arrangement for Load Step 5<br />

− STEP 7: Variable loads for minimum bending moment at pier P1 (x = 18.43 m);<br />

the applied load is a SW/0 model on the left track with the following<br />

longitudinal arrangement:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!