EC2 – worked examples 4-5<br />

Considering that the TT element is cast under procedures subjected to a highly efficient<br />

quality control, in which the concrete cover length is also assessed, the value of Δcdev can<br />

be taken as 5 mm.<br />

We obtain from relation (3.1):<br />

c = c + Δc = 25 + 5 = 30 mm .<br />

nom min dev<br />

Calculating now the concrete cover for longitudinal bars.<br />

We have:<br />

c = 12 mm .<br />

min,b<br />

We obtain from table 4.4N - EC2:<br />

c = 25 mm .<br />

min,dur<br />

Moreover:<br />

Δc dur, γ = 0 ;<br />

Δc dur,st = 0 ;<br />

Δc = 0 .<br />

dur,add<br />

From relation (3.2):<br />

cmin = max (c min,b ; cmin,dur +Δcdur, γ −Δcdur,st −Δc<br />

dur,add;<br />

10 mm) =<br />

= max (12; 25 + 0 – 0 – 0; 10 mm) = 25 mm .<br />

We obtain from relation (3.1):<br />

c = c + Δc = 25 + 5 = 30 mm .<br />

nom min dev<br />

Note that for the ordinary reinforcement bars, the concrete cover for stirrups is “dominant”.<br />

In this case, the concrete cover for longitudinal bars is increased to: 30 + 8 = 38 mm .<br />

Table of Content<br />

Fig. 4.3<br />

Calculating now the concrete cover for strands.