SIeMpelkAMp | MACHIneRy AnD PLAnts<br />

Building fans Combined heat and power unit<br />

the result is impressive: At maximum heat<br />

utilization between fall and spring, a total<br />

efficiency of up to 87 percent, regarding<br />

the burned natural gas, is achieved.<br />

During the summer when heating energy<br />

consumption is at a minimum, the heat<br />

is released into the environment, consequently,<br />

the degree of efficiency is<br />

decreased. “Altogether, we expect savings<br />

of 15 to 20 percent in the primary energy<br />

consumption compared to today’s supply<br />

situation,” says Klaus Gartz.<br />

Prepared for winter<br />

Big events have cast their shadows ahead<br />

since fall of 2011. Back then the largescale<br />

excavation and installation work for<br />

the gas and local heating pipelines and<br />

for the electrical control for the heat distribution<br />

started on siempelkamp premises.<br />

At the same time the company-own<br />

medium-voltage grid was upgraded, the<br />

new Büttner building integrated into the<br />

electricity network and a significantly<br />

stronger power supply line was installed<br />

between the public power grid and the<br />

factory building.<br />

After completing the startup and acceptance<br />

phase in mid-December 2012,<br />

the combined heat and power unit is expected<br />

to supply almost the entire amount<br />

of electricity and approximately half of the<br />

required heat for the company. the production<br />

buildings take precedence, however,<br />

other companies of the siempelkamp<br />

Group at the location can benefit from<br />

surplus electricity. It is also planned to feed<br />

additional electricity into the public power<br />

grid.<br />

Rising energy costs demand good energy<br />

management: It is forecast that energy<br />

costs will further increase in the future. In<br />

order to be prepared, siempelkamp will<br />

introduce an energy management system<br />

in addition to the combined heat and power<br />

18<br />

19<br />

unit for the efficient use of electricity and<br />

heat. Both systems will be managed by<br />

Klaus Gartz, just as the photovoltaic<br />

system, which was installed in 2011. the<br />

self-sufficient operation will be ensured,<br />

the maintenance and inspection of the<br />

operating parameters guaranteed.<br />

Furthermore, within the meaning of an integrated<br />

energy concept, we will continue<br />

to improve the use of the heat generated<br />

by the combined heat and power unit. We<br />

are already planning an absorption-type<br />

refrigeration system for room air conditioning.<br />

this system will use heating water at<br />

105° C for cooling. “If the energy consumption<br />

in our factory should sustainably<br />

increase in the future, for example, due<br />

to additional large machine tools, the installation<br />

of another combined heat and<br />

power unit could be worthwhile. For this<br />

case, we have already designated a location<br />

and heating network capacity,” says<br />

Klaus Gartz thinking about the future.