28.05.2013 Views

OAO Ivatsevichdrev - Siempelkamp

OAO Ivatsevichdrev - Siempelkamp

OAO Ivatsevichdrev - Siempelkamp

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Siempelkamp</strong> Machine Factory<br />

• <strong>Siempelkamp</strong> production facility at Krefeld location<br />

• Operating as independent company under the name<br />

siempelkamp Maschinenfabrik GmbH since January 2012<br />

• 470 employees<br />

• 480,000 production hours<br />

• Unique feature: machining of very large workpieces (up to 450 t)<br />

• Services:<br />

– Flame cutting<br />

– Welding<br />

– straightening<br />

– Machining<br />

– Deep hole drilling<br />

– Hydraulics assembly<br />

– Pipeline construction<br />

– Painting<br />

– Final assembly<br />

The factory hall with the other cranes<br />

SIeMpelkAMp | MACHIneRy AnD PLAnts / nUCLeAR teCHnoLoGy<br />

Preparations are under way<br />

in the same hall in which both double-<br />

girder bridge cranes are used.<br />

the most important among all large-scale<br />

machines is the vertical lathe and milling<br />

machine which was designed and built for<br />

siempelkamp by schiess GmbH in Aschersleben.<br />

this large machining center is one<br />

of the most extraordinary of the past<br />

decades: the Vertimaster VMe 10 singlecolumn<br />

machine machines mill heads,<br />

grinding plates, and grinding tables as<br />

well as components for the wind power<br />

industry. Component parts with weights<br />

of up to 400 t (441 Us tons) and heights<br />

of up to 6 m (20 ft) can fit on the faceplate,<br />

which can be extended with the<br />

help of beams mounted to the faceplate in<br />

a star-shaped arrangement, thus resulting<br />

in a machining diameter of up to 16 m<br />

(52 ft).<br />

the production capacity in Krefeld was<br />

expanded by 3,000 m² in order to accommodate<br />

the vertical lathe and milling<br />

machine. A third double-girder bridge<br />

crane became urgently necessary. “With<br />

the new crane we are able to operate the<br />

turning lathe, and thus minimize expensive<br />

waiting periods for a crane. the parallel<br />

setting up of large parts results in a clear<br />

efficiency increase during production,”<br />

describes Michael Kubbe.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!