OAO Ivatsevichdrev - Siempelkamp
OAO Ivatsevichdrev - Siempelkamp
OAO Ivatsevichdrev - Siempelkamp
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SIeMpelkAMp | MACHIneRy AnD PLAnts / nUCLeAR teCHnoLoGy<br />
Process step on the floor of the factory hall<br />
<strong>Siempelkamp</strong>-<strong>Siempelkamp</strong> = win-win<br />
After the new crane passed the acceptance<br />
test at sKt’s location in Moormerland<br />
on May 30, the installation of the<br />
crane started at the end of June with the<br />
delivery of both bridges for the crane. the<br />
crane has a width of 28 m (92 ft) and<br />
a lifting height of 15.5 m (51 ft). With<br />
dimensions like these, it can be presumed<br />
that a logistical challenge was imminent.<br />
the delivery, the clearing of the hall, the<br />
relocation of all existing cranes in the hall,<br />
the pre-assembly, followed by the setting<br />
up of the box girders and trolleys and the<br />
assembly took two weeks. “the work of<br />
the three sKt assemblers and crane operators<br />
was exemplary. they assembled the<br />
bridges, which have a total weight of 140 t<br />
(154 Us tons), in a safe and timely manner,”<br />
says Michael Kubbe.<br />
Following the testing and acceptance by<br />
a crane expert, the new crane has been<br />
operating since mid-July. the first workpiece<br />
that was mounted onto the faceplate<br />
with the help of the crane was a mill<br />
head segment manufactured at siempelkamp<br />
Foundry – one more good example<br />
supporting siempelkamp’s strategy of<br />
not just making use of synergies but of<br />
opening up new ones!<br />
The crane is put into position<br />
Up in the air – finished!<br />
32<br />
33