OAO Ivatsevichdrev - Siempelkamp
OAO Ivatsevichdrev - Siempelkamp
OAO Ivatsevichdrev - Siempelkamp
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SIeMpelkAMp | nUCLeAR teCHnoLoGy 38 39<br />
A strong team for SGL Group: Karl Utz, Markus<br />
Lipp, Reinhard Dirr, Thies Steffen (SKT) and<br />
Christian Stuchly<br />
dimensions, maximum hook heights, and<br />
the arrangement of the crane hooks relative<br />
to each other in the travel directions of<br />
the crane and trolley.<br />
As the regulations for safety distances<br />
be tween cranes and the prescribed dimen<br />
sions for accessible craneways have<br />
changed over the years, there was overall<br />
less space available in which to install<br />
“more crane”. this task proved to be<br />
tricky, but it was able to be resolved as<br />
was the problem of ensuring acceptable<br />
accessibility for maintenance work, while<br />
re taining the minimal space conditions.<br />
After the successful installation and commissioning<br />
of the new crane, the sKt decommissioned<br />
the old crane, disassembled<br />
it, and delivered the new siempelkamp<br />
crane in April 2012, after acceptance<br />
testing by a crane expert. since then, it has<br />
been in continuous 24-hour use at the<br />
Meitingen plant, at ring kiln 2.<br />
SGL Group, Meitingen, ring kiln area: SKT double girder bridge crane with view to the crab trolleys and<br />
load pick-up