SIeMpelkAMp | nUCLeAR teCHnoLoGy 38 39<br />

A strong team for SGL Group: Karl Utz, Markus<br />

Lipp, Reinhard Dirr, Thies Steffen (SKT) and<br />

Christian Stuchly<br />

dimensions, maximum hook heights, and<br />

the arrangement of the crane hooks relative<br />

to each other in the travel directions of<br />

the crane and trolley.<br />

As the regulations for safety distances<br />

be tween cranes and the prescribed dimen<br />

sions for accessible craneways have<br />

changed over the years, there was overall<br />

less space available in which to install<br />

“more crane”. this task proved to be<br />

tricky, but it was able to be resolved as<br />

was the problem of ensuring acceptable<br />

accessibility for maintenance work, while<br />

re taining the minimal space conditions.<br />

After the successful installation and commissioning<br />

of the new crane, the sKt decommissioned<br />

the old crane, disassembled<br />

it, and delivered the new siempelkamp<br />

crane in April 2012, after acceptance<br />

testing by a crane expert. since then, it has<br />

been in continuous 24-hour use at the<br />

Meitingen plant, at ring kiln 2.<br />

SGL Group, Meitingen, ring kiln area: SKT double girder bridge crane with view to the crab trolleys and<br />

load pick-up