SieMpelkaMp | MACHInERy AnD PLAntS<br />
the new press was assembled and successcantly improves the crimping quality. 11,000 t (12,125 US tons) without transfully<br />
tested at the press manufacturer’s site. Furthermore, the closed-frame design abferring any additional forces into the foun-<br />
Even after these tests, the time schedule sorbs the press forces without transferring dation during the initial bending process.<br />
would remain tight. For the disassembly of them into the foundation.<br />
Furthermore, with dimensions of 9 x 13 x 16<br />
the old and assembly of the new press<br />
m (width x length x height), the press is so<br />
only five weeks were available during the <strong>Siempelkamp</strong> also scored with a new<br />
In ulla feugait, quat num vel ulpute faci blandrer ad tat ea commy nulputat il<br />
summer shutdown.<br />
tooling concept which allows the quick<br />
dolore dolestrud ex elent velit lummy num quis nulput nostrud dolore ver irit<br />
and precise adjustment to different plate<br />
nim adipit vendrerit venit wisl ing el utat, sissim diat.<br />
Project<br />
sizes and ensures shorter shutdown times.<br />
compact that it fits in the available space.<br />
A special feature of the press are the movable<br />
tools which press the plate against a<br />
next to the technology, other aspects were fixed counter piece. this is a new and<br />
With these limiting conditions EUROPIPE also important in the Autor: decision-making:<br />
In ulla feugait, quat patented num v method which <strong>Siempelkamp</strong><br />
put in a preliminary inquiry with three <strong>Siempelkamp</strong> assured a short delivery time used for the first time in this project. twelve<br />
well-known manufacturers. EUROPIPE’s and guaranteed, as the only supplier, the position-controlled horizontal cylinders<br />
own demand for continuous high quality completion date. the good experiences that stabilize the movable tools with an accuracy<br />
also had to be met by the supplier. the EUROPIPE has made with a <strong>Siempelkamp</strong> of 0.1 mm up to 6 m.<br />
specification sheet that was received by O-forming press since 1976 as well as the<br />
three machine manufacturers included, reputation of the Krefeld company were next to the press, the scope of supply also<br />
other than the already mentioned ones, also crucial for the selection of the supplier. included the hydraulic control, electric and<br />
comparatively few demands.<br />
electronic control units as well as the con-<br />
Technology<br />
trol and the modification of the existing<br />
<strong>Siempelkamp</strong>’s concept convinced EURO-<br />
roller conveyors. the disassembly of the<br />
PIPE: Compared to the C-frame design, <strong>Siempelkamp</strong> designed a press with a old press, the assembly and start-up of the<br />
the closed-frame design, suggested by closed-frame design. this design with- new press also became the sole responsi-<br />
Krefeld, is torsion-resistant which signifistands the high forming pressures of up to bility of <strong>Siempelkamp</strong>.<br />
Placement of the frame elements Machining of the beam at <strong>Siempelkamp</strong>