25.3 Project<br />
Phasing &<br />
Costing<br />
City Development Plan for Allahabad Final Report<br />
Institutional and<br />
Organizational<br />
Strengthening of MCA and<br />
other related organizations;<br />
Enhancement of<br />
environmental education to<br />
gain city residents'<br />
awareness towards garbage;<br />
and<br />
Identification and<br />
development of land filling<br />
Sites.<br />
Phasing of projects is based on weight and benefit based quantified priorities given in<br />
Annex 8. Project costs have been worked out taking into account various unit rates/ costs<br />
and quanitities of activities. Higher priorities indicate higher requirements and these<br />
projects are thus to be taken up first in community’s interest. Table 76 details out year-wise<br />
split of funds for various projects totalling to Rs. 28.00 crores –<br />
Project Identified<br />
Table 76: Projects and Cost Estimates<br />
Phase I<br />
Phase II Amount Priority<br />
(Rs<br />
2006-07 2007-08 2008-<br />
09<br />
2009-10 2010-112011-12 Lakh)<br />
Dumper Placer with handle<br />
container of 4.5 cubic meter<br />
capacity (5 trips per day,<br />
average)<br />
100 250 250 100 100 - - 800 High<br />
Dumper Placer Containers<br />
of 4.5 cubic meter capacity<br />
each<br />
5 10 10 - - - - 25 High<br />
Tractors 40 60 50 40 20 - - 210 High<br />
Hydraulic tractor tipping<br />
trolley<br />
40 40 40 30 -- - - 150 High<br />
Platforms and ramping for<br />
tipping trolleys<br />
10 10 10 10 -- - - 40 High<br />
Skip Lifter for construction<br />
debris<br />
30 40 40 30 20 - - 160 High<br />
Skips of 7 cubic meter<br />
capacity<br />
4 4 4 4 4 - - 20 High<br />
Hand Carts 20 30 30 20 20 - - 120 High<br />
Bulldozer 100 100 100 100 - - - 400 High<br />
Fully equipped medical<br />
waste collection vehicle<br />
20 20 20 20 - - - 80 High<br />
Weigh bridge of 15 ton<br />
capacity for the landfill cum<br />
compost plant site<br />
10 20 20 10 - - - 60 High<br />
Incinerator for hospital<br />
waste, complete with<br />
chimney and civil works etc<br />
(100kg/hr capacity)<br />
10 30 30 30 - - - 100 High<br />
Development of land fill<br />
sites for inert waste<br />
produced as 400 MT per<br />
day (average)<br />
20 50 50 50 30 - - 200 High<br />
Finalization of conventional 10 20 10 - - - - 40 High<br />
140