City Development Plan for Allahabad Final Report<br />
Name of the Stakeholder Mr. Amrit Abhijat (DM), Mr. Gaya Prasad (MC),<br />
Engineers from Jal Nigam, Jal Sansthan, MCA<br />
Date of Discussion 19 th May, 2006<br />
Time of Discussion 2.30-6.00 pm on 19 th May, 2006<br />
Discussion Team Mr. I.H.Khan<br />
Discussion Agenda<br />
• Presenting the current situation<br />
• Chalking out a Vision on Infrastructure and Utilities<br />
Focus Areas<br />
• Water Supply system<br />
• Sewerage & Drainage system<br />
• Storm Water Drainage<br />
• Solid Waste Management<br />
• Environmental Pollution<br />
Summary of Discussion<br />
Water Supply<br />
• Current Production capacity – 200 lpcd<br />
• Huge losses in the line<br />
• Very old & inadequate pipeline<br />
• Insufficient storage system (UGR, OHT)<br />
• No detailed information about the existing network in<br />
terms of age, adequacy (size), location/ layout, pipe depth,<br />
pipe material and length<br />
• Primary survey is needed to find out the location and<br />
design aspects (survey/ inventory)<br />
• Topography<br />
• Reorganization of the system<br />
• Need of renewal of existing treatment plant<br />
• Need of augmentation of existing pumping station<br />
• Replace ground water source with surface water<br />
• Proposal of new treatment plant<br />
• Proposal of new pumping station<br />
• Allocation of land for new water works<br />
• Tapping point for new treatment system (Kareli, Naini)<br />
• Change/ replacement of old and damaged lines with new<br />
and adequate pipelines<br />
• Unauthorized connections are there due to poor management<br />
• Control of theft by providing GIS system and strong management system<br />
• Identification of water scarce area<br />
• Segregation of water zones<br />
• Clarriflocculator is not functional due to improper design<br />
• Design new water supply network considering the existing system is defunct and good<br />
pipelines of existing network can be used whatever and whenever<br />
Sewerage and Drainage System<br />
225