City Development Plan for Allahabad Final Report<br />

Table 99: Identification of Stakeholders for the Projects<br />

URBAN RENEWAL<br />

Project Identified Total Costs of<br />

Project<br />

Stakeholder<br />

Construction of Southern bypass<br />

38959 PWD<br />

BRIDGE<br />

CORPORATION<br />

-<br />

Construction of road divider and<br />

footpath<br />

300 PWD -<br />

Flyovers<br />

2000 PWD<br />

BRIDGE<br />

CORPORATION<br />

-<br />

Widening of existing RUB (at Road<br />

level)<br />

128 PWD RAILWAYS -<br />

Intersection improvement 135 PWD MCA -<br />

Road lighting 500 MCA -<br />

Multi-level parking 4500 MCA Private party -<br />

Zebra marking, lane markings and<br />

signages<br />

15 MCA PWD<br />

TRAFFIC<br />

POLICE<br />

Removal of enchroachment 1500 MCA ADA -<br />

Relocation of bus terminals 2400 ADA UPSRTC MCV<br />

Relocation of truck terminals 3400 ADA UPSRTC MCV<br />

Relocation of wholesale market 3590 MCA ADA -<br />

Provision of Cattle colonies/ dairies 400 MCA ADA -<br />

Play grounds for children (4 nos) 100 MCA ADA -<br />

Neighbourhood markets (15 nos) 1500 MCA ADA -<br />

Total 59427<br />

Project Identified<br />

Renovation/ rehabilitation &<br />

construction of new water supply<br />

schemes for the city<br />

Estimated cost for the Kumbh<br />

mela area for the pilgrims @ 1.0<br />

crore per mld for 5.0 mld for the<br />

complete water supply<br />

infrastructure<br />

Rain water harvesting<br />

arrangement<br />

WATER SUPPLY<br />

Total Costs of Project<br />

22000<br />

600<br />

600<br />

Inventory survey of the existing<br />

15<br />

scheme @ Rs. 2000.00 per km<br />

Layout planning, designing, and<br />

40<br />

preparation of DPR (LS)<br />

Generator set to provide supply<br />

350<br />

during the no of hours of<br />

electricity and all kinds of<br />

electro-mechanical equipments<br />

like pumps, panels etc<br />

Unforeseen items 120<br />

Grand Total 24318.12<br />

JAL NIGAM<br />

MCA<br />

JAL NIGAM<br />

JAL NIGAM<br />

JAL NIGAM<br />

JAL NIGAM<br />

JAL NIGAM<br />

Stakeholder<br />

JAL<br />

SANSTHAN -<br />

JAL<br />

SANSTHAN JAL NIGAM<br />

JAL<br />

SANSTHAN -<br />

JAL<br />

SANSTHAN -<br />

JAL<br />

SANSTHAN -<br />

JAL<br />

SANSTHAN -<br />

JAL<br />

SANSTHAN -<br />

183