20.08.2013 Views

Hx1-Hx2 Manual-1.4.1 - Telos

Hx1-Hx2 Manual-1.4.1 - Telos

Hx1-Hx2 Manual-1.4.1 - Telos

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.1.5 T3 Test - Feed Through Test<br />

TroublesHooTInG | 39<br />

Press the button to advance to the next diagnostic test. The Line Status display should<br />

indicate ‘T3’. This test takes audio present at the SEND IN XLR connector and feeds it to the<br />

LINE RJ11 connector without any processing. Likewise, whatever signal is being fed into the<br />

LINE RJ11 connector will be routed to the RCV OUT XLR connector.<br />

This test enables you to test the studio and telephone input and output levels. If you like, press<br />

the button to skip past this diagnostic test. After the last test in the sequence is complete,<br />

the unit will reset itself and return to normal operation.<br />

6.2 Hardware Repairs<br />

A consequence of modern surface-mount construction is that it is frequently no longer possible<br />

for local repairs to be made. Special and expensive equipment is required to change parts. As<br />

well, today’s equipment is complicated and requires repair technicians to have specific product<br />

experience and training and access to high-end test equipment.<br />

At the same time, the advent of overnight delivery services means that equipment can be<br />

returned to the factory for quick turn-around repair. Therefore, we do not expect you to repair<br />

this unit at the component level, and we do not include schematics of the unit in the manual.<br />

Upon request, our support staff can fax or mail you a schematic, should you need one. Please see<br />

the first pages of this manual for proper procedures on returning units for repair.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!