- Page 1 and 2:
FAIR/NUSTAR/R 3 B/TDR NeuLAND Techn
- Page 3 and 4:
Germany EMMI and FIAS: Enrico Fiori
- Page 5 and 6:
INR Moscow: Alexander Botvina Russi
- Page 7 and 8:
Contents Executive Summary 11 1. In
- Page 9:
B.7. MRPC Solution using Glass as C
- Page 12 and 13:
Apart from the excellent energy res
- Page 14 and 15:
processes in the universe, such as
- Page 16 and 17:
decaying into 24 O plus 4 neutrons
- Page 19 and 20:
2. Physics Scenarios: Requirements
- Page 21 and 22:
e studied at R 3 B at FAIR include
- Page 23 and 24:
all theoretical calculations predic
- Page 25 and 26:
at the surface of the nucleus. The
- Page 27 and 28:
the evolution of fission channels (
- Page 29 and 30:
3. Summary of NeuLAND Prototype Res
- Page 31 and 32:
counts 70 60 50 40 30 20 10 0 15 15
- Page 33 and 34:
Figure 3.4.: Shown is the time reso
- Page 35 and 36:
4. Monte Carlo Simulations Within t
- Page 37 and 38:
normalized counts normalized counts
- Page 39 and 40:
GEANT3 interface. Here, we compare
- Page 41 and 42:
Counts 1000 900 800 700 600 500 400
- Page 43 and 44:
counts 5 10 4 10 3 10 2 10 10 LAND
- Page 45 and 46:
incident neutron fully active detec
- Page 47 and 48:
investigated. Three values for the
- Page 49 and 50:
spectrum, absorption length, refrac
- Page 51 and 52:
Counts 600 500 400 300 200 100 with
- Page 53 and 54:
Since, as discussed above, several
- Page 55 and 56:
events 800 600 400 200 0 0 200 400
- Page 57 and 58:
clusters N 100 50 0 0 500 1000 1500
- Page 59 and 60:
In the following section we discuss
- Page 61 and 62: events 15000 10000 5000 input outpu
- Page 63 and 64: events 2000 1500 1000 500 σ = 15 k
- Page 65 and 66: 5. Technical Specifications and Des
- Page 67 and 68: construction, or for subsequent rep
- Page 69 and 70: positioning of 50 submodules mounti
- Page 71 and 72: Figure 5.6.: Detector frame with fi
- Page 73 and 74: 5.4. Peripheral Systems 5.4.1. Read
- Page 75 and 76: Figure 5.12.: The photo shows the T
- Page 77: 6. Radiation Environment and Safety
- Page 81 and 82: 8. Calibration 8.1. Calibration wit
- Page 83 and 84: Figure 8.3.: ToF distribution in 10
- Page 85: Figure 8.4.: Event display for seve
- Page 89 and 90: 10. Installation procedure, its Tim
- Page 91: 11. Cost and Funding 11.1. Cost Est
- Page 94 and 95: The timeline for milestone 1 includ
- Page 96 and 97: 96 2. Sample Tests Random samples o
- Page 98 and 99: PNPI St. Petersburg: G.D. Alkhazov,
- Page 100 and 101: HV 1.$ mm 2$ mm 0+$1-2)-2'.%/ 5%4'.
- Page 102 and 103: Beamline Be exit window P 6 P 3 P 4
- Page 104 and 105: B.3. Design Issues Addressed with 4
- Page 106 and 107: Time [ns] Counts 41 40 39 2200 2000
- Page 108 and 109: Efficiency 100 80 60 40 20 0 7.5 8
- Page 110 and 111: 200 AMeV, Erel = 100 keV emitted %
- Page 114 and 115: 114
- Page 116 and 117: [Bot-04] S. Botvina andI.N. Mishust
- Page 118 and 119: [Lip-03] C. Lippmann, PhD Thesis, U