8 <strong>Transmission</strong> <strong>Expansion</strong> <strong>Plann<strong>in</strong>g</strong> Under Uncerta<strong>in</strong>ty and Vagueness 104<br />

28.8<br />

235.7<br />

575.2 G5<br />

G6<br />

L6<br />

6<br />

17.17<br />

Mean of <strong>Power</strong> <strong>in</strong> MW<br />

17.72<br />

5<br />

148.7<br />

58.2<br />

238.5<br />

188.0<br />

136.9<br />

limit=200<br />

limit=140<br />

189.5 20.95 5.2<br />

Fig. 8.1- S<strong>in</strong>gle l<strong>in</strong>e diagram of the eight bus test system<br />

TL4<br />

4 98.8<br />

16.38 1 2 3<br />

G1,1 81.3<br />

G2,1 (IPP)<br />

64.8<br />

TL2<br />

98.8<br />

L2<br />

283.1<br />

L3 25.20<br />

G3 285.3<br />

305.9<br />

Mean of LMP <strong>in</strong> $/MWhr<br />

Table 8.1 - Characteristics of new generator and IPP<br />

Bus No. Type M<strong>in</strong> (MW) Max (MW) PDFof Bid ($/MWhr) Unavailability<br />

4 Gen. 0 150 N~(22, 3) 0.02<br />

4 IPP 0 N~(100, 20) N~(20, 2) 0.02<br />

generator of bus 4 is closed, either a new generator or a new IPP may be <strong>in</strong>stalled <strong>in</strong> this bus.<br />

Characteristics of the new generator and IPP are given <strong>in</strong> table 8.1. The steps of transmission<br />

expansion plann<strong>in</strong>g are described <strong>in</strong> bellow.<br />

1) Identify<strong>in</strong>g the set of possible strategic scenarios<br />

The follow<strong>in</strong>g scenarios are def<strong>in</strong>ed to cover above non-random uncerta<strong>in</strong>ties:<br />

Scenario 1: Base case<br />

Scenario 2: Base case m<strong>in</strong>us the generator of bus 4<br />

Scenario 3: Base case m<strong>in</strong>us the generator of bus 4 plus the new generator<br />

Scenario 4: Base case m<strong>in</strong>us the generator of bus 4 plus the new IPP<br />

Occurrence degrees of above scenarios are low, high, medium, and high respectively.<br />

2) Suggest<strong>in</strong>g candidates for transmission expansion<br />

PDFs of LMPs are computed for the peak load of plann<strong>in</strong>g horizon of the exist<strong>in</strong>g network at<br />

different scenarios. If between each two buses that have average LMP difference greater than<br />

53.9<br />

28.29<br />

31.4<br />

L4<br />

158.3<br />

79.7<br />

G4<br />

281.6<br />

78.0<br />

27.43<br />

7<br />

26.30<br />

L8<br />

8<br />

G7<br />

238.0<br />

189.7