Transmission Expansion Planning in Deregulated Power ... - tuprints
Transmission Expansion Planning in Deregulated Power ... - tuprints
Transmission Expansion Planning in Deregulated Power ... - tuprints
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8 <strong>Transmission</strong> <strong>Expansion</strong> <strong>Plann<strong>in</strong>g</strong> Under Uncerta<strong>in</strong>ty and Vagueness 104<br />
28.8<br />
235.7<br />
575.2 G5<br />
G6<br />
L6<br />
6<br />
17.17<br />
Mean of <strong>Power</strong> <strong>in</strong> MW<br />
17.72<br />
5<br />
148.7<br />
58.2<br />
238.5<br />
188.0<br />
136.9<br />
limit=200<br />
limit=140<br />
189.5 20.95 5.2<br />
Fig. 8.1- S<strong>in</strong>gle l<strong>in</strong>e diagram of the eight bus test system<br />
TL4<br />
4 98.8<br />
16.38 1 2 3<br />
G1,1 81.3<br />
G2,1 (IPP)<br />
64.8<br />
TL2<br />
98.8<br />
L2<br />
283.1<br />
L3 25.20<br />
G3 285.3<br />
305.9<br />
Mean of LMP <strong>in</strong> $/MWhr<br />
Table 8.1 - Characteristics of new generator and IPP<br />
Bus No. Type M<strong>in</strong> (MW) Max (MW) PDFof Bid ($/MWhr) Unavailability<br />
4 Gen. 0 150 N~(22, 3) 0.02<br />
4 IPP 0 N~(100, 20) N~(20, 2) 0.02<br />
generator of bus 4 is closed, either a new generator or a new IPP may be <strong>in</strong>stalled <strong>in</strong> this bus.<br />
Characteristics of the new generator and IPP are given <strong>in</strong> table 8.1. The steps of transmission<br />
expansion plann<strong>in</strong>g are described <strong>in</strong> bellow.<br />
1) Identify<strong>in</strong>g the set of possible strategic scenarios<br />
The follow<strong>in</strong>g scenarios are def<strong>in</strong>ed to cover above non-random uncerta<strong>in</strong>ties:<br />
Scenario 1: Base case<br />
Scenario 2: Base case m<strong>in</strong>us the generator of bus 4<br />
Scenario 3: Base case m<strong>in</strong>us the generator of bus 4 plus the new generator<br />
Scenario 4: Base case m<strong>in</strong>us the generator of bus 4 plus the new IPP<br />
Occurrence degrees of above scenarios are low, high, medium, and high respectively.<br />
2) Suggest<strong>in</strong>g candidates for transmission expansion<br />
PDFs of LMPs are computed for the peak load of plann<strong>in</strong>g horizon of the exist<strong>in</strong>g network at<br />
different scenarios. If between each two buses that have average LMP difference greater than<br />
53.9<br />
28.29<br />
31.4<br />
L4<br />
158.3<br />
79.7<br />
G4<br />
281.6<br />
78.0<br />
27.43<br />
7<br />
26.30<br />
L8<br />
8<br />
G7<br />
238.0<br />
189.7