Appendix C: Examples for Locational Marg<strong>in</strong>al Price 123<br />

400 MW @ $10/MWhr<br />

dispatched 300 MW<br />

Fig. C.3- 2 bus system – case 3<br />

200 MW @ $15/MWhr<br />

dispatched 0 MW<br />

LMP: 10$10/MWhr 1 Limit: 200 MW 2 LMP: 15 $10/MWhr<br />

100 MW<br />

Bid: $20/MWhr<br />

400 MW @ $10/MWhr<br />

dispatched 300 MW<br />

200 MW<br />

250 MW @ $12/MWhr<br />

dispatched 50 MW<br />

200 MW @ $15/MWhr<br />

dispatched 0 MW<br />

LMP: 10$10/MWhr 1 Limit: 200 MW 2<br />

LMP: 12 $10/MWhr<br />

100 MW<br />

Bid: $20/MWhr<br />

200 MW<br />

250 MW<br />

Bid: $12/MWhr<br />

Curtailed: 50 MW<br />

250 MW<br />

Bid: $12/MWhr<br />

Fig. C.4- 2 bus system – modell<strong>in</strong>g load 2 with a fix load and an imag<strong>in</strong>ary generator