Appendix B: An Example on Decision Analysis 118<br />
Table B.1- Discounted costs of expansion plans<br />
Beg<strong>in</strong>n<strong>in</strong>g of year 1 Beg<strong>in</strong>n<strong>in</strong>g of year 5 Beg<strong>in</strong>n<strong>in</strong>g of year 7<br />
Double-circuit l<strong>in</strong>e, first circuit 30 23.76 21.15<br />
Double-circuit l<strong>in</strong>e, second circuit 6 4.75 4.23<br />
S<strong>in</strong>gle-circuit l<strong>in</strong>e 20 15.84 14.10<br />
Medium voltage cable 14 11.09 9.87<br />
As figure B.1 shows, at the first stage of decision we can make on of the follow<strong>in</strong>g decisions:<br />
• double-circuit l<strong>in</strong>e with the first circuit,<br />
• s<strong>in</strong>gle-circuit l<strong>in</strong>e, or<br />
• medium voltage cable.<br />
Consider figure B.1 and suppose the network is re<strong>in</strong>forced by double-circuit l<strong>in</strong>e with the first<br />
circuit. If load A is added at the beg<strong>in</strong>n<strong>in</strong>g of year 5, we can make one of the follow<strong>in</strong>g<br />
DCL-FC<br />
MVC<br />
Decision Node<br />
Event Node<br />
SCL<br />
1<br />
2<br />
3<br />
A<br />
A<br />
A<br />
A<br />
A<br />
A<br />
DCL-SC<br />
MVC<br />
No Invest<br />
Fig. B.1 – Decision-event tree for expansion plann<strong>in</strong>g of the <strong>in</strong>dustrial network<br />
SCL<br />
MVC<br />
No Invest<br />
DCL-FC<br />
SCL<br />
No Invest<br />
4<br />
5<br />
1<br />
6<br />
7<br />
2<br />
5<br />
7<br />
3<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
B<br />
No Invest<br />
No Invest<br />
DCL-SC<br />
No Invest<br />
DCL-SC<br />
No Invest<br />
No Invest<br />
No Invest<br />
SCL<br />
No Invest<br />
MVC<br />
No Invest<br />
DCL-SC<br />
No Invest<br />
SCL<br />
No Invest<br />
No Invest<br />
First stage decision Event Second stage decision Event<br />
Third stage decision<br />
Time Period 1 Time Period 2 Time Period 3<br />
SCL<br />
4<br />
4<br />
8<br />
5<br />
4<br />
1<br />
6<br />
6<br />
9<br />
7<br />
7<br />
2<br />
8<br />
5<br />
9<br />
7<br />
7<br />
3