4 Market Based Criteria 44<br />

cost. On the other word, it shows how much competition is encouraged per unit of<br />

transmission cost.<br />

• Decrease <strong>in</strong> annual load payments divided by annual transmission cost:<br />

The annual load payment dur<strong>in</strong>g the peak load of plann<strong>in</strong>g horizon after add<strong>in</strong>g plan k is<br />

given by:<br />

with:<br />

k<br />

TPeak<br />

k<br />

tlp<br />

ANLP = µ<br />

(4.25)<br />

k<br />

ANLP annual load payment dur<strong>in</strong>g the peak load of plann<strong>in</strong>g horizon after add<strong>in</strong>g<br />

plan k <strong>in</strong> $<br />

Decrease <strong>in</strong> annual load payment per unit of annual transmission cost of plan k is equal to:<br />

with:<br />

k<br />

FANLP 0<br />

k<br />

ANLP − ANLP<br />

= k<br />

ANIC − DANOC<br />

k<br />

(4.26)<br />

k<br />

F ANLP decrease <strong>in</strong> annual load payment per unit of annual transmission cost of plan k<br />

This criterion shows how much annual load payments deceases per unit of transmission cost.<br />

However, this criterion does not consider competition among customers.<br />

4.4 Case Study<br />

Consider the 8-bus network of section 3.3, which is redrawn <strong>in</strong> figure 4.5. Network eng<strong>in</strong>eers<br />

suggest the follow<strong>in</strong>g plans for transmission expansion:<br />

Plan 1: <strong>in</strong>stall<strong>in</strong>g a l<strong>in</strong>e between buses 1 and 4<br />

Plan 2: <strong>in</strong>stall<strong>in</strong>g a l<strong>in</strong>e between buses 2 and 4<br />

Plan 3: <strong>in</strong>stall<strong>in</strong>g a l<strong>in</strong>e between buses 5 and 4<br />

Plan 4: <strong>in</strong>stall<strong>in</strong>g a l<strong>in</strong>e between buses 2 and 3<br />

Plan 5: <strong>in</strong>stall<strong>in</strong>g a l<strong>in</strong>e between buses 5 and 3<br />

In order to select the plan which encourages competition at the most, each plan is added to the<br />

network and market based criteria are computed for each plan. Due to the lack of data about<br />

transmission cost of the suggested expansion plans, transmission cost is ignored <strong>in</strong> this<br />

k<br />

k<br />

example ( σ is used as plann<strong>in</strong>g criterion <strong>in</strong>stead of F<br />

µ<br />

σ and so on).<br />

µ<br />

lmp<br />

lmp