- Page 1 and 2:
32EMSE0035 OM91-138 ABBOTSFORD 010
- Page 3 and 4:
Appendix I: LIST OF FIGURES page 28
- Page 5 and 6:
The Hepburn Fault zone is indicated
- Page 7 and 8:
1.0 INTRODUCTION Geophysical ground
- Page 9 and 10:
(30 mi) to the southeast. By road t
- Page 11 and 12:
11 3.2 Property History Canadian Su
- Page 13 and 14:
13 Ontario side ace Cominco Limited
- Page 15 and 16:
15 The La Relne River portion of th
- Page 17 and 18:
17 5.2 Property Mineralization Vary
- Page 19 and 20:
19 6.0 MAGNETOMETER SURVEY The old
- Page 21 and 22:
21 7.0 INDUCED POLARIZATION SURVEY
- Page 23 and 24:
partial intermittent magnetic corre
- Page 25 and 26:
25 (b) Anomaly H-l Zone (IP Anomaly
- Page 27 and 28:
27 O.D.M. (1979) O.D.M. (1972) O.G.
- Page 29:
29 APPENDIX I. LI ST OF FIGURES
- Page 32 and 33:
KING AND KERRICH M Z O M EH l O W C
- Page 34 and 35:
30 APPENDIX II: PROPOSED DIAMOND DR
- Page 36 and 37:
32 APPENDIX III: DETAILED BUDGET PR
- Page 38 and 39:
34 APPENDIX IV: PROJECT EXPENDITURE
- Page 40 and 41:
36 La Reine River Property Expendlt
- Page 42 and 43: 19. Supplies: LaRelne: gas for skl-
- Page 44 and 45: Project Funding 1 A. Amos L. Blain
- Page 47: f s (X Is li (0 g e3 f o X S 10 i2
- Page 51 and 52: NO. 0608 SAMPLE(S)OF: SAMPLE(S) FRO
- Page 53 and 54: 06-JUN-91 REPORT 15605 DPH- REF.FIL
- Page 55 and 56: XRAL 06-JUN-91 REPORT 15605 REF.FIL
- Page 57 and 58: XRAL XRF - WHOLE ROCK ANALYSIS 06-J
- Page 59 and 60: DELL-WHITE ANALYTICAL LABORATORIES
- Page 61 and 62: NO. 042 '92 82/94 13*39 S 705 672 5
- Page 63 and 64: '92 02/64 13148 S 785 672 5843 BELL
- Page 65 and 66: Operating Model C-816/826 Portable
- Page 67 and 68: 32E04SE0035 OM91-138 ABBOTSFORD 020
- Page 69 and 70: Appendix I: LIST OF FIGURES page 26
- Page 71 and 72: 5 intermediate tuff. The anomaly on
- Page 73 and 74: L-954648 to L-954652 inclusive L-95
- Page 75 and 76: 3.0 EXPLORATION HISTORY 3.1 Regiona
- Page 77 and 78: electromagnetic and VLF survey usin
- Page 79 and 80: 13 4.O GEOLOGY 4.1 REGIONAL GEOLOGY
- Page 81 and 82: 15 5.0 MINERALIZATION 5.1 Regional
- Page 83 and 84: 17 6.0 CURRENT WORK CARRIED OUT 6.1
- Page 85 and 86: 19 7.0 RESULTS 7.1 Diamond Drilling
- Page 87 and 88: 21 8.0 CONCLUSIONS AND RECOMMENDATI
- Page 89 and 90: 23 REFERENCES de Carle, R.J. (1988)
- Page 91: 25 CERTIFICATE OF QUALIFICATION I,
- Page 95 and 96: ,J ! i , j l W'" K^ j L - *^ ' -D
- Page 97 and 98: 27 APPENDIX II: DIAMOND DRILL HOLE
- Page 99 and 100: DIANOJD DRILL RECORD NflME OF PROPE
- Page 101 and 102: D1WOND DRILL RECORD NOTE OF PROPERT
- Page 103 and 104: DIAMOND DRILL RECORD NAME OF PROPER
- Page 105 and 106: 28 APPENDIX III: GEOLOGICAL CROSS S
- Page 107 and 108: —— l * DOS O 2 UJ o UJ ;;r - s
- Page 109 and 110: 29 APPENDIX IV: GRID PLANS-DIAMOND
- Page 111 and 112: T UJ *O \ \M\, \ LU CM \ \ \ \ \\ \
- Page 113 and 114: 30 APPENDIX V: ASSAYS
- Page 115 and 116: BELL-WHITE ANALYTICAL LABORATORIES
- Page 117 and 118: 32 PATTEN RIVER PROJECT SUMMARY OF
- Page 119 and 120: 34 PATTEN RIVER PROJECT •w • -
- Page 121 and 122: 36 PATTEN RIVER PROJECT Expend!ture
- Page 123 and 124: 32E04SE0035 OU91-138 ABBOTSFORD l 0
- Page 125 and 126: -2- IV- DATA PRESENTATION The maps
- Page 127 and 128: 3 ' .2 -* * ** ^ " I -1-- a l HI
- Page 130 and 131: LLJ O Q tt C L Si -r" l . J X t] /
- Page 132 and 133: LU O O (D C ID 0 fc 0) Q iO) Q. Q c
- Page 134 and 135: s to o) C (O c •t: d) o - s /l i.
- Page 137: S 3 - O©O
- Page 140 and 141: UJ l NO) •i Kl l i l0 lo. X t o N
- Page 142 and 143:
. O^ in K in *7 csi in y UJ Q Q o:
- Page 144 and 145:
32E04SE0035 OM91-138 ABBOTSFORD l 0
- Page 146 and 147:
Appendix I: LIST OP FIGURES page 23
- Page 148 and 149:
ppb Au over 3.99 metres in a strong
- Page 150 and 151:
7 2.2 Location and Access The prope
- Page 152 and 153:
Black River Area was carried out by
- Page 154 and 155:
11 4.O GEOLOGY 4.1 REGIONAL GEOLOGY
- Page 156 and 157:
13 5.0 MINERALIZATION 5.1 Regional
- Page 158 and 159:
15 The alteration zone is within a
- Page 160 and 161:
17 7.0 DISCUSSION OP RESULTS Interp
- Page 162 and 163:
19 footwall of the North Branch of
- Page 164 and 165:
Larder Lake Mining Division, Ontari
- Page 166 and 167:
23 APPENDIX I: LIST OP FIGURES
- Page 168 and 169:
GEOPHYSICS/GEOCHEMISTRY (35) r, v a
- Page 170 and 171:
24 APPENDIX II: PROPOSED DIAMOND DR
- Page 172 and 173:
26 APPENDIX III: DETAILED BUDGET PR
- Page 174 and 175:
28 APPENDIX IV: PROJECT EXPENDITURE
- Page 176 and 177:
30 Lightning River Property Expendi
- Page 178 and 179:
32E04SE0035 OM91-138 ABBOTSFORD 050
- Page 180 and 181:
SUMMARY The Lightning River Propert
- Page 182 and 183:
1.0 INTRODUCTION An Induced Polariz
- Page 184 and 185:
8 3.0 EXPLORATION HISTORY 3.1 Regio
- Page 186 and 187:
induced polarization surveys. Five
- Page 188 and 189:
12 volcanics to the north of the fa
- Page 190 and 191:
14 2) The MeDermott gold deposit Is
- Page 192 and 193:
16 6.0 INDUCED POLARIZATION SURVEY
- Page 194 and 195:
18 8.0 CONCLUSIONS AND RECOMMENDATI
- Page 196 and 197:
20 REFERENCES Belanger, Remy (1991)
- Page 198 and 199:
22 CERTIFICATE OF QUALIFICATION I,
- Page 200 and 201:
^ |T \ r- 1 v
- Page 202 and 203:
*U* j. fo S' r •-^*KI ^ ^ -N-r.s
- Page 204 and 205:
25 LIGHTNING RIVER PROPERTY PROPOSE
- Page 206 and 207:
27 PHASE II EXPLORATION To consist
- Page 208 and 209:
29 Summary of Expenditures - 1991 L
- Page 210 and 211:
|j[ LJ UJ UJ O {O CD O io 10 ro 5f
- Page 212 and 213:
954880 954873 954879 954544 954545
- Page 214 and 215:
LU O fO Ul ro * -l UJ CD ro UJ O UJ
- Page 216 and 217:
o Ci PR-11- 3 U) S 2 O —— -h
- Page 218 and 219:
LEGEND ••• Total Field Mag Tr
- Page 220:
ION •;V-r? :- '"^'"iiiiiiitjrviii