13.01.2014 Views

Safe Quarry - Health and Safety Authority

Safe Quarry - Health and Safety Authority

Safe Quarry - Health and Safety Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 7<br />

AIR RECEIVERS<br />

the competent person to up to 4 years, however a<br />

suitable hydraulic test must be carried out within<br />

that period.<br />

Every examination <strong>and</strong> test must be carried out by<br />

a competent person <strong>and</strong> a report (containing the<br />

items set out in Schedule 4 to the regulations<br />

(Appendix 4)) of the result of every such examination<br />

<strong>and</strong> test must be made in writing. The competent<br />

person must provide this report to the operator<br />

within 24 hours of the examination <strong>and</strong> test.<br />

Where it is specified that the air receiver can not<br />

continue to be used safely or that the safe working<br />

pressure is reduced the operator must prevent its use<br />

until it is made safe. Additionally, the operator shall<br />

forward a copy of any such report to the <strong>Health</strong> <strong>and</strong><br />

<strong>Safe</strong>ty <strong>Authority</strong> within 7 days of receiving the report.<br />

Provisions also allow an Inspector of the <strong>Authority</strong><br />

to have an air receiver re-examined <strong>and</strong> the cost of<br />

such re-examination is recoverable from the<br />

operator.<br />

84<br />

SAFE QUARRY GUIDELINES TO THE SAFETY, HEALTH AND WELFARE AT WORK (QUARRIES) REGULATIONS 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!