<strong>REVISTA</strong> ROMÂNĂ <strong>DE</strong> AUTOMATICĂ<br />
5<br />
Optimum wet mixing time (37s) was<br />
established at 96% coated particles by similar<br />
procedure with AASHTO T 195 [1].<br />
3. Experimental research regarding the<br />
general automation and information<br />
integrated system of the pilot central<br />
The general integrated automation and<br />
information of the pilot central CEMA 15 has<br />
a modular structure being distributed on two<br />
machines and including 2 levels:<br />
- level one , consisting of field equipment that<br />
command technological installations and<br />
appliances that provide information about the<br />
technological equipment;<br />
- level two, consisting of the PLC, the<br />
cabinets and the computer in which are stored<br />
recipes for asphalt mixtures, screens to<br />
control the technological process and display<br />
data of the process<br />
There were tested the hardware and software<br />
conditions necessary to achieve experiments<br />
with the whole system:<br />
- the PLC installed in the control room and<br />
the cabinet on the machine 1;<br />
- the computer installed in the control room<br />
of the machine 2;<br />
- the PLC drawer on machine 2 connected<br />
through PROFIBUS-DP to the PLC drawer<br />
on machine 1;<br />
- the central unit of the PLC connected to the<br />
PC via ETHERNET;<br />
- connecting all the elements related to the<br />
pre-batch equipment to digital inputs<br />
modules, analogue and digital outputs of the<br />
PLC on machine1.<br />
- the program realized in STEP7<br />
programming language downloaded to the<br />
memory of the PLC;<br />
- WIN CC FLEXIBLE 2005 RUNTIME<br />
installed on the PC in the control room of the<br />
station;<br />
- the software made in WIN CC FLEXIBLE<br />
2005 programming language installed on the<br />
PC in the control room of the station.<br />
4. Conclusions<br />
The validated solutions obtained by the<br />
experimental results on the pilot station<br />
CEMA 15 will by applied at bigger scale in<br />
the structure of asphalt mixing plants, of<br />
larger productivities.<br />
Acknowledgements<br />
Authors acknowledges with thanks the<br />
cooperation of S.c. NE<strong>SA</strong>ND Tulcea, mr.<br />
eng. Virgil Barabangiuc.<br />
References<br />
[1] Asphalt Institute “The asphalt handbook”,<br />
Manual series no.4 (MS-4), no. 3, 1989<br />
edition, Chapter 5 – Manufacture of<br />
Hot-Mix Asphalt, pp. 175-231.<br />
[2] *** SR 174-1/2002 – Lucrari de drumuri.<br />
Imbracaminti bituminoase cilindrate<br />
executate la cald. Conditii tehnice de calitate.<br />
[3] *** SR 7970:2001 – Lucrari de drumuri.<br />
Straturi de baza din mixturi cilindrate<br />
executate la cald. Conditii tehnice de calitate<br />
si prescriptii generale de executie.<br />
[4] Siemens - WinCC V6.0 Basic<br />
Documentation, Edition: 04/03.<br />
[5] Siemens - WinCC User Archives,<br />
Edition: 11/98.<br />
AR4-1.doc