• providing office space for KBA staff that will allow them to promote all programs and<br />
initiatives of KBA;<br />
• providing space for KBA meetings and events; and<br />
• providing exhibit space to showcase success stories of KBA.<br />
ACTUAL<br />
Existing or planned facilities as of January 2011 were between 35,480 and 74,641 net sf, as<br />
stated above. Our investigation found that as of the end of fieldwork, the actual available<br />
incubator space is over 80,000 net sf.<br />
Incubator Estimated Actual<br />
KUMC Breidenthal 15,000 15,500<br />
KC Biotechnology Center 4,500 4,500<br />
UMKC unknown unknown<br />
Independence REC 7,900 13,000<br />
LDCBA-BTBC 8,061 8,361<br />
LDCBA BTBC Expansion Facility 17,500 17,500<br />
"Kit" Bond Science & Technology Incubator 9,100 15,000<br />
KBA 12,580 12,432<br />
Total 74,641 81,193<br />
In summary, it appears that some due diligence was performed relating to the market demand for<br />
incubator space prior to the decision to proceed with construction. The projections, however,<br />
appear to have underestimated the supply of incubator space in the current market.<br />
Project Budget<br />
A $12 million preliminary budget for a 25,000 sf building program was brought before the BOD<br />
in October 2008. The 25,000 sf size was the minimum set forth in the Development Agreement.<br />
Based on the market demand studies previously discussed, KBA management and the BOD<br />
decided that a larger building was necessary. In December 2008, the BOD was approached<br />
again with revised costs given the increased size of the building. The actual size of the building<br />
is 38,773 sf.<br />
The total cost to construct the Venture Accelerator was $14,934,654. The BOD approved<br />
$10,631,200 for the general contract for construction of the building, and $4,303,454 for<br />
ancillary contracts, which include architectural fees, office furniture and fixtures, audio/visual<br />
equipment, lab equipment, etc. See the Incubator Financing section below for details of the<br />
project funding.<br />
Selection of Architects<br />
KEGA required that KBA work through the State Building Advisory Committee (“SBAC”) for<br />
the selection of incubator architects, providing a list of architects from which KBA could choose.<br />
The SBAC list of architects determined to be proficient in lab design included the following:<br />
• PGAV Architects<br />
• Gould Evans<br />
• HMN Architects, Inc.<br />
• Treanor Architects/The Clark Emerson Partners<br />
55