• providing office space for KBA staff that will allow them to promote all programs and<br />

initiatives of KBA;<br />

• providing space for KBA meetings and events; and<br />

• providing exhibit space to showcase success stories of KBA.<br />

ACTUAL<br />

Existing or planned facilities as of January 2011 were between 35,480 and 74,641 net sf, as<br />

stated above. Our investigation found that as of the end of fieldwork, the actual available<br />

incubator space is over 80,000 net sf.<br />

Incubator Estimated Actual<br />

KUMC Breidenthal 15,000 15,500<br />

KC Biotechnology Center 4,500 4,500<br />

UMKC unknown unknown<br />

Independence REC 7,900 13,000<br />

LDCBA-BTBC 8,061 8,361<br />

LDCBA BTBC Expansion Facility 17,500 17,500<br />

"Kit" Bond Science & Technology Incubator 9,100 15,000<br />

KBA 12,580 12,432<br />

Total 74,641 81,193<br />

In summary, it appears that some due diligence was performed relating to the market demand for<br />

incubator space prior to the decision to proceed with construction. The projections, however,<br />

appear to have underestimated the supply of incubator space in the current market.<br />

Project Budget<br />

A $12 million preliminary budget for a 25,000 sf building program was brought before the BOD<br />

in October 2008. The 25,000 sf size was the minimum set forth in the Development Agreement.<br />

Based on the market demand studies previously discussed, KBA management and the BOD<br />

decided that a larger building was necessary. In December 2008, the BOD was approached<br />

again with revised costs given the increased size of the building. The actual size of the building<br />

is 38,773 sf.<br />

The total cost to construct the Venture Accelerator was $14,934,654. The BOD approved<br />

$10,631,200 for the general contract for construction of the building, and $4,303,454 for<br />

ancillary contracts, which include architectural fees, office furniture and fixtures, audio/visual<br />

equipment, lab equipment, etc. See the Incubator Financing section below for details of the<br />

project funding.<br />

Selection of Architects<br />

KEGA required that KBA work through the State Building Advisory Committee (“SBAC”) for<br />

the selection of incubator architects, providing a list of architects from which KBA could choose.<br />

The SBAC list of architects determined to be proficient in lab design included the following:<br />

• PGAV Architects<br />

• Gould Evans<br />

• HMN Architects, Inc.<br />

• Treanor Architects/The Clark Emerson Partners<br />

55