Preston Township Wayne County - Shepstone Management Company
Preston Township Wayne County - Shepstone Management Company
Preston Township Wayne County - Shepstone Management Company
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
“[The applicant] certifies the information contained in this application is true and correct.<br />
Alterations from this approved plan by the present or future owners is a violation of the<br />
<strong>Preston</strong> <strong>Township</strong> Subdivision and Land Development Ordinance. Changes in the scope<br />
and/or limits of the project and its features will require a new application to be submitted.<br />
[signature of applicant]”<br />
This statement must appear on the map with an original signature of the applicant on<br />
every copy submitted for approval.<br />
11.8 Final Plan Supporting Materials. The following items shall be submitted by the applicant in support<br />
of and as part of the final plan:<br />
11.8.1 An application or letter of intent, as the case may be, signed by the property owner,<br />
including a statement that the application is for final approval and clearly indicating which<br />
lots are to be included for consideration. The letter should authorize municipal officials<br />
and representative(s) to enter the property for inspection(s) required by the application<br />
and concisely explain the scope of the proposal. One (1) original and six (6) copies are<br />
required.<br />
11.8.2 All applicable fees as required herein.<br />
11.8.3 Six (6) copies of evidence (usually in the form of a letter) that DEP has reviewed and<br />
accepted the subdivision or land development as an amendment to <strong>Township</strong>'s Official<br />
Plan in accordance with the provisions of the Pennsylvania Sewage Facilities Act and<br />
Chapter 71, Administration of the Sewage Facilities Program.<br />
11.8.4 Six (6) copies of as-built drawings, including cross-sections, profiles and other design<br />
specifications for any the following improvements that have been required or installed in<br />
accordance with these or applicable regulations, unless the same have been financially<br />
guaranteed pursuant to § 14 hereof:<br />
11.8.4.1 Streets, bridges or culverts.<br />
11.8.4.2 Storm water management facilities.<br />
11.8.4.3 Water service facilities other than individual on-lot wells.<br />
11.8.4.4 Central sewage disposal facilities.<br />
11.8.4.5 Electric, telephone, gas and cable television service facilities other than those<br />
extensions designed to serve individual dwelling units on each lot.<br />
§ 12 Required Improvements - Generally<br />
<strong>Preston</strong> <strong>Township</strong>, <strong>Wayne</strong> <strong>County</strong><br />
Subdivision and Land Development Ordinance<br />
Physical improvements to the proposed subdivision or land development shall be provided, constructed<br />
Page 28 of 73