26.04.2014 Views

34-36 Bedford Road, London SW4 - Lambeth Council

34-36 Bedford Road, London SW4 - Lambeth Council

34-36 Bedford Road, London SW4 - Lambeth Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Reason: To ensure an adequate level of parking is provided in accordance with<br />

the aims of sustainable development in accordance with policies 9 and 14 of the<br />

Unitary Development Plan (2007) Policies Saved Beyond 05 August 2010 and<br />

not superseded by the Local Development Framework Core Strategy 2011 and<br />

policy S4 of the Core Strategy.<br />

24 Notwithstanding what is shown in the approved drawings, prior to the<br />

commencement of development, details of cycle parking to include the<br />

allocation of the spaces between commercial and residential uses, the design<br />

and appearance of the cycle stores and the means of storage shall be submitted<br />

to and approved by the Local Planning Authority in writing, and the development<br />

shall be carried out in accordance with these details unless otherwise agreed in<br />

writing.<br />

Reason: To ensure an appropriate appearance, that an acceptable number of<br />

spaces are allocated to the residential use and a safe and secure method of<br />

storage is proposed in accordance with Policies 9, 14, 32, 33, 38 and 47 of the<br />

Saved Unitary Development Plan (2007) and Core Strategy policies S4 and S9)<br />

25 Prior to the commencement of development, details of electric vehicle charging<br />

points for 5 car parking spaces and passive provision for 2 car parking spaces<br />

shall be submitted to and approved in writing by the Local Planning Authority.<br />

The development shall be carried out in accordance with the approved details<br />

unless otherwise approved in writing.<br />

Reason: To ensure a sufficient number of electric vehicles charging points are<br />

provided in accordance with the aims of sustainable development in accordance<br />

with policies 9, 14 and 35 of the Unitary Development Plan (2007) Policies<br />

Saved Beyond 05 August 2010 and not superseded by the Local Development<br />

Framework Core Strategy 2011 and policy S4 and S7 of the Core Strategy.<br />

Employment Floorspace<br />

26 The proposed employment floorspace shall be finished and serviced for<br />

immediate user-ready (turn-key) occupation at the same time as the residential<br />

units hereby proposed are completed.<br />

Reason: To ensure the delivery of and the effective management of the<br />

proposed employment floorspace is undertaken to ensure that employment<br />

opportunities in the Borough are maximised and to support local economic<br />

development (Saved policy 23 of the Adopted Unitary Development Plan and<br />

policy S3 of the Core Strategy (2011) refer).<br />

Sustainability<br />

27 The development hereby approved shall be built to a minimum standard of<br />

BREEAM ‘very good’. Prior to the occupation of the approved building, a copy of<br />

the Post Construction Certificate verifying that BREEAM ‘very good’ has been<br />

achieved shall be submitted to the local planning authority.<br />

Reason: In the interests of sustainable development in accordance with <strong>Council</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!