34-36 Bedford Road, London SW4 - Lambeth Council
34-36 Bedford Road, London SW4 - Lambeth Council
34-36 Bedford Road, London SW4 - Lambeth Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Policy S7 of the Core Strategy (2011)<br />
28 The development hereby approved shall be built to a minimum standard Code<br />
for Sustainable Homes level 3. Prior to the occupation of the approved building,<br />
a copy of the Post Construction Certificate verifying that Code for Sustainable<br />
Homes level 3 has been achieved shall be submitted to the local planning<br />
authority.<br />
Reason: In the interests of sustainable development in accordance with <strong>Council</strong><br />
Policy S7 of the Core Strategy (2011)<br />
29 Details of the final energy strategy including calculations demonstrating how a<br />
reduction in predicted carbon emissions through on site renewable energy<br />
generation of 20% will be achieved shall be submitted to the local planning<br />
authority prior to the commencement of development. The approved measure<br />
shall be implemented as agreed.<br />
Reason: In the interests of sustainable development in accordance with <strong>Council</strong><br />
Policy S7 of the Core Strategy (2011)<br />
Archaeology<br />
30 No development shall take place until the applicant has secured the<br />
implementation of a programme of archaeological work in accordance with a<br />
written scheme for investigation which has been submitted to and approved by<br />
the Local Planning Authority. The development shall only take place in<br />
accordance with the detailed scheme unless otherwise agreed in writing. The<br />
archaeological works shall be carried out by a suitably qualified investigating<br />
body acceptable to the Local Planning Authority.<br />
Reason: In the interests of the protection of any archaeological remains in<br />
accordance with policy S9 of the Core Strategy (2011)<br />
Informatives<br />
1 This decision letter does not convey an approval or consent which may be<br />
required under any enactment, by-law, order or regulation, other than Section<br />
57 of the Town and Country Planning Act 1990.<br />
2 Your attention is drawn to the provisions of the Building Regulations, and related<br />
legislation which must be complied with to the satisfaction of the <strong>Council</strong>'s<br />
Building Control Officer.<br />
3 You are advised that future applications at this site will need to comply with the<br />
relevant parking standards.<br />
4 The development of the site is may have an impact on archaeological remains.<br />
The applicant should therefore submit detailed proposed in the form of an<br />
archaeological project design. The designs should be in accordance with<br />
appropriate English Heritage guidelines.