CONCENTRATING SOLAR SYSTEMS UNIT<br />

In <strong>2006</strong>, in addition to contributing to SCSU activities, such as improving<br />

own R&D capabilities and technological training of third parties, the High <strong>Solar</strong><br />

Concentration Group, HSCG, performed three basic types of activity:<br />

• System <strong>de</strong>velopment, which at the present time of commercial <strong>de</strong>ployment<br />

of these technologies could be un<strong>de</strong>rstood as cooperating<br />

with the <strong>de</strong>velopers promoting the first generation of commercial central<br />

receiver solar thermal power plants, such as PS10 (with Solucar-<br />

Abengoa) or <strong>Solar</strong> tres (with Sener).<br />

• Component <strong>de</strong>velopment for central receiver technology by initiative or<br />

collaboration in national (such as AVANSOL) or international (such as<br />

HICON-PV or SOLHYCO) projects.<br />

• Improvement of experimental capacities and quality procedures (as IN<br />

MEPSOCON)<br />

3.3.1 SOLAR TRES<br />

15 MW e Molten Salt <strong>Solar</strong> Thermal Power Demonstration<br />

Plant<br />

Participants: SENER Ingeniería y Sistemas, S.A. (E), GHER,S.A. (E), CIEMAT-<br />

PSA (E), Compagnie <strong>de</strong> Saint Gobain, S.A. (F), SIEMENS Aktiengesellschaft<br />

(D)<br />

Contacts:<br />

Javier Viñals (javier.vinals@sener.es), Juan Ignacio Burgaleta<br />

(ignacio.burgaleta@sener.es); Félix M. Téllez<br />

(felix.tellez@ciemat.es)<br />

Funding: CEC- DG TREN (ENERGIE Program, Ref.:NNE5/369/2001): 5 M€<br />

Duration: December 2002-December 2007<br />

Background: The Project accumulates the experience of the previous <strong>Solar</strong><br />

Two project, but also has <strong>de</strong>sign innovations, as a consequence of work performed<br />

together by Sener and the CIEMAT as well as the technical conditions<br />

imposed by Spanish legislation on solar thermal power. The initial <strong>Solar</strong> Tres<br />

project was pre<strong>de</strong>signed to meet the requisites of the Spanish legal frame-<br />

Figure 3.7<br />

Flow diagram of the <strong>Solar</strong> Tres plant<br />