CONCENTRATING SOLAR SYSTEMS UNIT<br />

3.3.3 PS10<br />

10 MW <strong>Solar</strong> Thermal Power Plant for Southern Spain<br />

Participants: SOLUCAR (E) Coordinator, CIEMAT (E), DLR (D), Fichtner (D).<br />

Contacts:<br />

Funding:<br />

Duration:<br />

Valerio Fernán<strong>de</strong>z (valerio.fernan<strong>de</strong>z@pssm.abengoa.com); Félix<br />

M. Téllez (felix.tellez@ciemat.es)<br />

The Project has received a 5-M€ subsidy from the European<br />

Commission DG TREN ENERGIE Program.(Ref. NNE5-1999-<br />

00356), and 1.2 M€ from the Andalusian Government.<br />

July 2001 to July 2004 (participation of CIEMAT exten<strong>de</strong>d by specific<br />

Agreement up to plant startup in March 2007).<br />

Background: The PS10 Project, begun in 1999, has had a long history to date<br />

and awakens many expectations in the solar community, as it is the first<br />

commercial solar tower initiative insi<strong>de</strong> and outsi<strong>de</strong> of Spain. For the PSA, the<br />

PS10 project is of enormous importance as the obligatory reference that focuses<br />

research and technology <strong>de</strong>velopment and channels feedback from industry,<br />

in this case the SOLUCAR company, and a public research organism<br />

like the CIEMAT, for <strong>de</strong>finition of joint <strong>de</strong>velopment strategies for heliostats,<br />

advanced concentrators, solar receivers, software co<strong>de</strong>s and tools and thermal<br />

storage, all subjects which have generated projects fun<strong>de</strong>d by the Ministry<br />

of Education and Science PROFIT Program.<br />

Purposes: The main purpose of the PS10 Project (Planta <strong>Solar</strong> 10) is to <strong>de</strong>sign,<br />

build and operate a commercial solar thermal power plant with tower<br />

and heliostat field system having a rated gross power of 11 MW. This plant<br />

has been installed in the municipal limits of Sanlúcar la Mayor in the Province<br />

of Seville and is expected to be inaugurated in March 2007.<br />

Achievements in <strong>2006</strong>: In <strong>2006</strong>, construction and installation were completed<br />

and commissioning was begun. During this stage, the PSA-CIEMAT advised<br />

Solucar on operating procedures and selection of instrumentation for special<br />

variables, such as solar flux infrared measurement during receiver adjustment<br />

and testing, etc.<br />

Publications: [3.19]<br />

Figure 3.11 Infrared measurement of the PS10 receiver during commissioning (14/12/06) from<br />

three field observation points<br />

3.3.4 HICONPV<br />

High Concentration PV Power System.<br />

Participants: Solúcar Energía (coordinator), DLR, Fraunhofer ISE, CIEMAT-<br />

PSA, CIEMAT, RWE (D), Ben Gurion Univ. (IL), EDF and Univ. Malta.<br />

Contact: Jesús Fernán<strong>de</strong>z Reche (Jesús.fernan<strong>de</strong>z@psa.es)<br />